Although the route database of bus systems are indispensable in a monitor routine, the traditional methods of special process can not deal with these datum efficiently. According to route datum of bus systems, this paper used GIS to propose three deductive methods of road names, station names and station coordinates. Furthermore, this paper uses empirical cases to illustrate the proposed methods, the results show that the construction times of bus routes can be shortened within 5 minutes from 2.5 hours, and all conditions of route length and link can conform to within 96%.
為了持續優化網站功能與使用者體驗,本網站將Cookies分析技術用於網站營運、分析和個人化服務之目的。
若您繼續瀏覽本網站,即表示您同意本網站使用Cookies。