透過您的圖書館登入
IP:18.218.61.16
  • 學位論文

民間參與公共建設案營運階段績效評估制度建置

The Performance Evaluation System Setting for Private Participation in Infrastructure Project of Operator Stage.

指導教授 : 林谷峻

摘要


民間參與公共建設是希望透過私部門效率的投入,使公部門能創造更高的施政績效,營運的成果除了彰顯私部門的營運績效外,更關係到公部門的施政績效。然不同單位、不同管理者角度,對績效之看法也不盡相同,因此,公私部門間需要建立一套客觀可行的績效衡量指標,除可適切的衡量民間參與公共建設的成效、協助私部門朝組織願景邁進、加強公部門的管理外,並可做為公私部門溝通的平台,有效的消除溝通與傳達上的問題。 本研究以OT案例的個案機構為研究對象,以動態平衡計分卡理論為基礎,藉由文獻資料的蒐集、調查分析及公私部門之深度訪談等方式,篩選建立適切可衡量之相關指標,設計一套符合民間參與公共建設之民參案的績效評估機制,以改善個案機構之績效評估制度,據此提供政府發展民間參與公共建設之民參案,在民間實際營運後,績效項目及標準評估制度之具體參考建議。 透過訪談分析,本研究所建構的四個主要評量構面中,學習與成長構面在衡量員工滿意度,資訊系統投資,人力資本-招募與訓練;內部流程構面在衡量技術技能,人力資本-經驗累積與創新技能;顧客構面以口碑,行銷效果與實際觀展人數三個大項衡量;財務構面則是衡量營業淨利與現金流量兩大指標。這些構面下的指標除了可再細分為更小的衡量指標項目外,更能環環相扣,互顯因果,呈現研究對象之經營成果與體質,可提供資料作為發現問題,診斷體質與評量的基礎。

並列摘要


The Private Sector’s Participation in Infrastructure tried to use the efficiency operation of the private sectors to increase the public performance. Unfortunately, private and public sector mangers see performance from different point of view. Therefore, to build a fair performance evaluation index between the private and public sectors has several merits. It could judge the private sector’s operation performance from both the vision of private and public sector; not only increase the management of public sector; but also be the commutation platform for private and the public sector to eliminate the commutation problems. In this thesis, an Operation-Transfer (OT) case is used as a study object. Based on the concept of “Dynamic Balanced Scorecard”, literature review, and interviews with private and public sector managers, an advanced performance measurement system is established. It could improve the performance measurement system of the private sector. And provide the concrete comment of performance evaluation of the private sector to the public sector. The four major evaluation perspectives are as follows: first, employee satisfaction, investment in information system and human capital-recruitment and training are measured in learning and growth perspective. Second, technical skill, human capital-experience accumulation and innovation skill are measured in internal process perspective. Third, word of mouth, marketing effectiveness and actual museum visitor number are measured by customer perspective. Finally, net income and cash flow are measured by financial perspective. These major indexes can be divided into more detail indexes with the explanation of the relationship between their causes and results. And demonstrate the internal operation and the operation result of the target case. The information is useful for business to locate and diagnose problems after the performance evaluation.

參考文獻


29. 袁玉珠(2001),公共工程預算執行績效評估指標之研究-平衡計分卡之應用,中原大學會計學系碩士論文。
46. 黃ㄧ峰(2004),「行政機關業務評估指標建構-以衛生署為例」,政府績效評估,台北:行政院研究發展考核委員會。
3.王明德等(2004),民間參與公共建設政策之績效評估制度及其運作機制之建置(第ㄧ期),行政院公共工程委員會。
57. 鄭淑文、蔣中柱(2003),民間參與營運招商作業案,行政院公共工程委員會網站。
51. 廖冠力(2002),以平衡計分卡來探討績效衡量指標-以國立成功大學學生事務處為例,國立成功大學工業管理科學系碩士在職專班碩士論文。

被引用紀錄


陳佳(2007)。以動態平衡計分卡觀點運用於國道高速公路服務區績效評估指標建立之研究--以湖口服務區為例〔碩士論文,淡江大學〕。華藝線上圖書館。https://doi.org/10.6846/TKU.2007.00868
魏家傑(2015)。民參案營運績效評估導入成效式契約之研究-以污水下水道建設為例〔碩士論文,國立臺灣大學〕。華藝線上圖書館。https://doi.org/10.6342/NTU.2015.00474

延伸閱讀