建置施工查驗照片防假防錯機制與儲存自動化系統

DEVELOPING ANTI-COUNTERFEITING AND ERROR-PROOF MECHANISMS, AND AUTOMATIC STORAGE WITH CONSTRUCTION INSPECTION PHOTOS SYSTEM

摘要


現場工程人員除面對工程現場施工狀態,尚須面對文書處理之瑣碎,工程施工階段產生之資料數量及種類繁雜,施工照片若未集中管理,人員調動可能導致記錄遺失而造成日後調閱困難。本研究以現有施工查驗流程為基礎,以施工照片處理過程的方便性為目的,開發輔助施工查驗進行之系統,結合行動裝置、GPS與BIM建築資訊模型,在查驗拍攝照片過程以「防假」與「防錯」機制對查驗照片產生加以限制,透過自動整理照片以減少人工操作,減少施工現場人工作業、增加未來照片調閱之效率及可被信任性。

並列摘要


On-Site engineers need to face a variety of tedious administrative routines such as inspection documentation and photos in addition the dynamic change of construction process. Current practices for inspection photographing require engineers to spent much effort in organizing photos at job site offices after shooting on-site and querying when necessary, and it is vey easy to falsify photos or make mistake during the process. This is because they lack automation in the process of creating, naming, and view photos. This research develops a system that utilizes mobile device, GPS, and BIM to automating the naming of inspection photos with anti-counterfeiting and error-proof mechanism, and management and viewing photos based on BIM information. Although the implemented prototype system is still not fully error-proof due to the limitation of accuracy of available GPS, it still demonstrates its usefulness and improves the creditability of inspection photos taken using the system.

參考文獻


廖軒晨(2016).工程專案品質管理資訊系統設計與開發(碩士論文).國立台灣科技大學營建工程系.
郭哲瑜(2016).建築工程施工階段電子履歷系統之建置(碩士論文).中華大學.
公共工程委員會,品質計畫製作綱要,民 101 年 12 月 21 日修正 (2012)。
雲縣政府,雲林縣政府公共工程重點項目抽查檢驗作業要點 (2016)。
新北市政府採購處(2018).(新北市政府採購處,監造計劃書範本 (2018).).

延伸閱讀