批量分割於零工型排程之影響分析

Effect Evaluation of Lot Splitting in Job Shop Scheduling

摘要


在批量分割概念已被廣泛的運用於生產上藉以縮短總完工時間之同時,研究上大都以流程型生產系統之探討為主,至於在零工型生產系統之研究則寥寥可數。因此本研究旨在針對批量分割在零工型生產系統之應用作較為深入之探討,研究中並將每一作業具不可忽略之整備時間納入系統之考量。研究之進行分為兩階段,首先將問題在不分批之狀况下以在先關係圖描述之,而後發展以瓶頸漂移法為基之啓發式演算法進行求解以獲得所探討問題之初始解。隨後將各產品之生產量分為數個等子批,並以鄰點搜尋進行改善期獲得批量分割後之近似排程。為分析批量分割對於零工型生產環境之衝擊,本研究分別在最大完工時間最小化或提早/延遲完工懲罰値最小化之目標下以隨機產生之數據對於各種不同之問題規模及製程環境進行實驗分析。分析之結果顯示:將批量分割之觀念應用於零工型生產系統中可有效的縮短總完工時間或降低提早/延遲完工懲罰値,然而縮短之幅度以兩等批量分割之效益為最大,且隨著分割數之增加,縮短之幅度則逐漸趨緩。

並列摘要


As the lot splitting concept has been used widely to reduce the makespan in a productionsystem,most researches investigate the flow shop production systems and the job shopproduction systems have received much less attention relatively.This study investigatesthe application of lot splitting in a job shop production system with setup times whichcannot be omitted more thoroughly.The research is divided into two phases.First,Theaddressed job shop scheduling problem is illustrated by a disjunctive graph,then a shiftingbottleneck based heuristic is developed to solve the addressed scheduling problem withoutlot spitting.Following,each product is split into some consistent sublots,and aneighborhood searching procedure is then applied for finding a good solution.Two kindsof objectives that are minimizing makespan and early/tardiness penalties are evaluated.Inorder to investigate the influence of the number of sublots,due dates and setup times on ajob shop production system with regard to the corresponding objective considered,someexperiments are conducted.The experimental results shown that the lot splitting caneffectively reduce makespan and early/tardiness penalties in the job shop schedulingproblem.Two consistent sublots make the largest benefit,however,the benefits aregradually reduced with increasing the number of sublots.

參考文獻


邱煥能、向士中(1996)。流程型工廠單產品批量流最佳解與探索解模式之研究。工業工程學刊。13(1),73-83。
邱煥能、張仁輝(1996)。流程型工廠單產品批量流移運批量最佳配置探索解模式之研究。工業工程學刊。13(4),329-341。
駱景堯(1999)。零工型生產系統之批量流研究。工業工程學刊。16(6),671-680。
Adams, J.,E. Balas,Zawacic, D.(1988).The shifting bottleneck procedure for job shop scheduling.Management Science.34(3),391-401.
Baker, K. R.,D. Jia(1993).A comparative study of lot streaming procedures.OMEGA.21(5),561-566.

被引用紀錄


黃輝耀(2009)。以基因演算法求解石英震盪器廠之平行機台排程問題〔碩士論文,中原大學〕。華藝線上圖書館。https://doi.org/10.6840/cycu200901169
蕭佳毓(2001)。晶圓製造廠考慮批量優先序之動態派工研究〔碩士論文,中原大學〕。華藝線上圖書館。https://doi.org/10.6840/cycu200100339