In order to monitor the insulation of XLPE cable of rail system, an On-line Partial Discharge (PD) Monitoring System applied for 1500V DC cables of Shanghai Traction Substation is described, including its hardware and software structure. After installed, this system successfully detected one PD signal. The results demonstrated that this system worked stably and reliably.