It is a critical task for the cleanroom designer to build up a cleanroom at optimized cost while achieving the lower operation cost under the same cleanroom cleanliness. This article discuss relationship between key design parameters of FFU selection, especially the size of FFU affecting the initial cost and operational cost, via simulation of a cleanroom casestudy.