後疫情時代營造業興建高科技廠之成本控管-以 G 營造廠為例

Cost control of construction industry building high-tech factories in the post-pandemic era

指導教授 : 張雍昇
共同指導教授 : 趙慕芬
本文將於2028/06/26開放下載。若您希望在開放下載時收到通知,可將文章加入收藏

摘要


本研究探討了後疫情時代興建高科技廠房的成本控制策略,以一家營造公司為例,探討後疫情時代對營造產業帶來的挑戰。本研究提出了具體的成本控制策略,例如在興建高科技廠時注意人力和材料成本,加強採購和財務會計運營等。提供了全球經濟趨勢的見解,包含半導體芯片市場需求的變化對台灣經濟的影響。歸因於台灣在全球經濟衰退期間實現增長的原因是政府努力促進產業升級和與其他國家合作。還探討了興建高科技廠和傳統廠之間的差異,包含資源需求、能力和成本,對於兩者工期時間和其施工辦法做詳細介紹,提供了有關後疫情時代興建高科技廠房營建成本控制策略的寶貴見解。該論文提供了關於全球經濟趨勢和台灣經濟發展的更廣泛要點,同時為在具有挑戰性的環境中想踏入興建高科技廠房的公司提供了實質的建議。 本研究採用個案訪談法及問卷以興建高科技廠房的成本控管為主軸,並對比了興建高科技廠與傳統廠房之間的差異。透過不同職務立場之多次專家訪問問卷,並將其整理成表格,歸納出興建高科技廠房的成本控管的相關注意細節,真實地將在現場會發生的狀況做進一步的解釋與說明。並將這些獲得的結論,從中給營建工程專業人員於興建高科技廠房應有的觀念與建議。

並列摘要


This research explores cost control strategies for constructing high-tech factories in the post-pandemic era, using a construction company as a case study to examine the challenges faced by the construction industry in the aftermath of the pandemic. The study proposes specific cost control strategies, such as emphasizing labor and material costs during the construction of high-tech factories, strengthening procurement and financial accounting operations, and provides insights into global economic trends, including the impact of changing demand in the semiconductor chip market on Taiwan's economy. The research attributes Taiwan's growth during the global economic recession to the government's efforts to promote industry upgrades and collaboration with other countries. The study also examines the differences between constructing high-tech factories and traditional factories, including resource requirements, capabilities, and costs. It provides a detailed overview of the project duration and construction methods for both types, offering valuable insights into cost control strategies for constructing high-tech factories in the post-pandemic era. The paper presents broader points about global economic trends and Taiwan's economic development while providing practical recommendations for companies looking to venture into constructing high-tech factories in a challenging environment. This research adopts a case study and questionnaire approach to focus on cost control in constructing high-tech factories and compares the differences between high-tech factories and traditional factories. Multiple expert interviews were conducted using different job positions, and the findings were summarized in tables, capturing relevant details regarding cost control in constructing high-tech factories and explaining real-life scenarios that may occur on-site. The conclusions drawn from these findings contribute to the understanding and recommendations for construction professionals involved in high-tech factory construction.

參考文獻


中文文獻:
王柏元(2022)後疫情時代的公司治理評鑑與盈餘管理之探討-以台灣上市(櫃)公司為例,明道大學企業管理學系碩士論文。
吳宗哲(2014)建築鋼筋施工品質提昇及成本控制之研究,正修科技大學營造工程研究所碩士論文。
李亞築(2021)國際化與產品多角化策略對公司價值與財務績效影響之研究-以台灣上市公司為例,國立中央大學財務金融學系碩士論文。
林忠楨(2017)中型營造廠跨建高科技廠房之變革管理個案分析,國立臺灣科技大學管理研究所碩士在職專班碩士論文。

延伸閱讀