Structure development on hillslope aims to enhance discharge of peak flow. In this study, the peak flow is estimated using the design of precipitation intensity with the same return period. The maximum discharge can be identified if and only if duration time equals concentration time (t_d = t_c). The change in peak flow rate can be obtained using the change in concentration time or surface roughness coefficient. The example of Taipei illustrates the increasing rate of the peak flow.