透過您的圖書館登入
IP:18.216.94.152
  • 期刊

不同時期之開發度對集水區逕流模擬之研究

A Watershed Rainfall-Runoff Simulation Model and It's Developmental-Intensity, a Historical View

摘要


為瞭解坡地集水區於不同型態之土地利用,及開發對於洪峰流量及洪峰到達時間之改變與影響,本研究利用不同時期之SPOT衛星影像及五千分之一像片基本圖求得其土地利用型態,結合GIS之空間分析技術,進而推算集水區開發度。並以數值地形模型為基礎,利用地理資訊系統及HEC-GeoHMS模組萃取試區集水區相關水文及地文參數,最後配合HEC-HMS水文模式進行降雨-逕流模擬分析,藉以探討逕流歷線之最佳模擬,以及推估不同類型之土地利用改變對集水區水文特性之影響,期以瞭解不同時期集水區開發度、洪峰量及洪峰到達時間上之變化關係。 選取八掌溪上游集水區為例模擬,結果顯示:八掌溪上游之集水區由於阿里山公路在民國71年開闢完工後,開發度隨時間增加而增大,其中又以中寮子集水區最靠近阿里山公路,故開發最為明顯,開發度從民國66年之6.6%,至民國83年之7.6%,到民國92年之10.2%。水文模擬方面:從民國66年到民國92年,經過26年之期間,逕流之洪峰時間大約提前一小時,洪峰流量增加大約18%到102%,逕流總量增加大約17%到73%。

並列摘要


Due to overpopulation and a shortage of plains, hillside development and utilization may play a very important role in Taiwan in the future. The land use and development of watershed areas on hillsides are significantly influenced by the variation in the peak discharge and concentration time. This research selected the watershed in the upstream watershed of the Pa Chang River. Via some SPOT images and the digitized images of 1/5000 aerial map, types of land-use that were found and the development intensity in the watershed can be calculated by means of GIS's spatial analysis technique. Furthermore, the hydrological and topographical data in the test area can be extracted using the GIS and HEC-GeoHMS model with DTM-based data processing. The optimal simulation on rainfall-runoff histogram and the effect of characteristics on the watershed due to the changes in different types of land-use were analyzed by means of HEC-HMS software. The results provide us with the relationships between(a) development intensity (b) peak discharge and (c) concentration time. The results show the developmental intensity of watershed increased over time due to the Alishan highway which was constructed in 1982. The most obviously developed area is located at the Zhongliao sub-basin which is the nearest area to the highway. The developmental intensity was 6.6% in 1977, 7.6% in 1994, and 10.2% in 2003. Hydrological simulation results show that during the 26 years (from 1977 to 2003) peak discharge increased by about 18%-102%. The total runoff increased by about 17%-73% and the concentration time decreased by about one hour.

並列關鍵字

landuse SPOT images development-intensity

被引用紀錄


張哲愷(2009)。以不同因素分析探討其對淹水潛勢的影響〔碩士論文,淡江大學〕。華藝線上圖書館。https://doi.org/10.6846/TKU.2009.01071
曹錫榮(2008)。降雨門檻值結合颱洪預警系統之研究〔碩士論文,國立臺北科技大學〕。華藝線上圖書館。https://doi.org/10.6841/NTUT.2008.00229
邱煌升(2009)。以OpenMI架構整合都市降雨逕流模式與雨水下水道模式〔碩士論文,中原大學〕。華藝線上圖書館。https://doi.org/10.6840/cycu200900230
王彥覃(2008)。應用自上而下與自下而上土地利用及降雨-逕流模式模擬土地利用變遷與水文量-以寶橋集水區為例〔碩士論文,國立臺灣大學〕。華藝線上圖書館。https://doi.org/10.6342/NTU.2008.01263

延伸閱讀