After the completion of 36-inch undersea pipeline laid of CPC, the PIG cleaning operation is progressed. This paper is to analyze the difficulty of gas dispatching encountered and the problem which the rust factor affecting the end user during this period of time and further to study the improvement of gas dispatching workflow by proposing the plan of adjusting the flow of undersea pipeline. Utilizing the time in exchange of the operation space, and under the premise of providing the steady and good quality gas, proceed the efficient rust screening to improve the efficiency the PIG pipeline cleaning. It is anticipated the benefits of avoiding the affect of gas dispatching and power plant end users and reduces the cost of pipeline cleaning, and solves the rust problem totally.