Suitable building protection measures may reduce lots of construction impact to the adjacent environment. The compensation grouting from inside bored tunnel is timely employed before ground loss develops up to ground surface. To conduct it, the grouting tube is inserted from the grout holes on segments to complete the secondary grouting into sublayer above the tunnel crown. Based on the long term instrumentation result, it indicates this method is also suitable for the soft soil condition of contract CC277 in the Taipei Mass Rapid Transit systems.