透過您的圖書館登入
IP:3.128.197.221
  • 期刊

全自動基樁載重試驗簡介

Automatic Static Pile Loading Test

摘要


基樁載重試驗是一項耗時的工作,尤其以循環加載法進行時,常需數天之久。本文介紹新發展成功之全自動基樁載重設備,包含三項主要部份:驅動系統、量測系統及微處理系統。試樁過程僅需一人操作,在鍵入所需數據如各循環之載重及保壓時間後,該設備即可自動執行完整的試樁過程。此外,傳統試樁可能產生之人為誤差及時差均可有效避免。

關鍵字

施工自動化 樁基礎 試樁

並列摘要


Static pile loading test using standard cyclic loading method is a time consuming work which may last for several days. The newly developed equipment presented in this paper consists three parts: driving system, measuring system and micro- processor system. The new test needs one person only to operate the computer controlled system and key in requiring data, load and time duration, for each cycle, and the test will run automatically. Using this method, the reading error and time lag for loading and unloading process happened during conventional test can simply be avoided.

延伸閱讀