Dynamic compaction technique has been used to improve the soil condition in FPG Sixth Cracking Project. Therefore, 5 patterns of dynamic compaction pilot test have been executed on Hi-Feng site to find the best combination of the drop height, grid spacing and applied energy. The verification results indicate that the effective improvement depth is between 9 and 11 meters. Moreover, the best improvement result is that of Type III which has the greatest applied energy. And Type I comes in second. These results correspond well with those obtained from foreign experience. The improvement results of Type II, Type IV and Type V, which have similar applied energy, are different due to their grid spacing, drop height, and numbers of drops. The above results clearly show that the construction planning is very important to dynamic compaction.