Shih-Kang Dam located at the downstream portion of Da-Jia River has the functions of regulating the tail water from upstream hydropower generation to provide water supply of Taichung area and irrigation water. The strong motion of the 921 Earthquake damaged Shih-Kang Dam seriously. The storage and diversion function of Shih-Kang Dam was lost, and around two million people in Taichung area suffered serious water shortage after the 921 earthquake. The rehabilitation of Shih-Kang Dam must be enforced for supplying water quickly. The primary rehabilitating works including foundation grouting, anchor bar embedding, treatment of concrete cracks, coffer dam for the preservation of the right bank crashed portion, and gate reparation were divided two stages for the construction. The first stage was for recovering the division function of the head works and the safety during flood season, and the second for recovering the partial ponding storage.