台南市大面積逆打深開挖案例探討

Case Study of a Large Scale Top-Down Basement Construction in Tainan City

摘要


本文以一個面積甚大、開挖甚深的成功案例闡述一個工程施工前安全檢討的重要性。周詳的事前檢討可以查覺深開挖工程問題的所在,事先做妥善的準備及預防,以將工程可能遭遇的風險或發生之災害降低至最輕微的程度;還可以在施工安全的控制上做最經濟的考量,使工程在兼顧安全及經濟下順利完成並獲得最大利益。本文案例之經驗應值得做為類似工程之參考。

關鍵字

深開挖 逆打工法 連續壁

並列摘要


This paper addresses the importance of pre-construction safety evaluation for a very large scale and very deep top-down excavation project in Tainan city. A thorough pre-construction safety evaluation can screen out potential construction hazards, preventive measures can also be implemented beforehand. As a result, potential risk or damage to a construction project is lowered to a minimal level; construction cost can also be lowered under favorable conditions. Experience gained in this deep excavation project clearly indicated the usefulness of pre-construction safety evaluation, which is a practice highly recommended for future projects.

被引用紀錄


陳易一(2010)。臺北都會區逆打開挖工程變形趨勢之研究〔碩士論文,國立臺北科技大學〕。華藝線上圖書館。https://doi.org/10.6841/NTUT.2010.00416
潘逸庭(2012)。黏土設計參數之驗證與模擬〔碩士論文,國立臺灣大學〕。華藝線上圖書館。https://doi.org/10.6342/NTU.2012.02307

延伸閱讀