Effects of Building Information Modeling During Construction

並列摘要


Building information modelling (BIM) and 4D modelling have both recently received widespread attention from the architectural, engineering and construction (AEC) industries. Research efforts to date have demonstrated that BIM and 4D technologies are able to provide faster and more effective communication of information between interested project parties and yield improved and innovative solutions stemming from better design along with other benefits. This paper describes the results of research focused on capturing the effects of BIM during the construction phase of the project. Four factors including requests for information, rework, change orders, and schedule compliance are discussed based on personal interviews with contractor employees experienced in the use of BIM. Eight case studies were conducted to explore the effect of BIM during the construction phase with respect of these four factors.

被引用紀錄


鄒運政(2017)。導入BIM於建築低耗能空調系統之效益評估〔碩士論文,國立臺灣大學〕。華藝線上圖書館。https://doi.org/10.6342/NTU201800640
Mony, M. (2013). 營建企業的BIM技術導入模型的 經驗性發展方法之研究 [doctoral dissertation, National Taiwan University]. Airiti Library. https://doi.org/10.6342/NTU.2013.00006
吳宗霖(2015)。台中市超高層建築帷幕牆工法之研究〔碩士論文,逢甲大學〕。華藝線上圖書館。https://doi.org/10.6341/fcu.M0118157
方嘉琪(2013)。營造廠BIM協同作業管理機制建置之研究〔碩士論文,國立臺北科技大學〕。華藝線上圖書館。https://www.airitilibrary.com/Article/Detail?DocID=U0006-1108201321325400

延伸閱讀