Taitung No.032 debris flow potential stream had been designated as a specific zone for soil and water conservation prevention. After the relevant to renovate the project in order to finish, the treatment works of administration effect must be taken. The investigate and analysis result learn that it is still intact to most construct instruments of the whole project in this district at present, but the original project did not considered the situation of sediment shift down may take place to control in the future, so advise supplementing and constructing the sediment deposit pond, it can prevent and let ability rising for the sediment disasters even more.