透過您的圖書館登入
IP:3.129.39.55
  • 期刊
  • OpenAccess

先進規劃排程系統應用於記憶體模組廠測試產能之研究

The Scheduling Study of Testing Memory Module by Using Advanced Planning and Scheduling System

摘要


記憶體模組產業投資金額龐大,技術層次高、價格變動劇烈、週期性的景氣循環等特性,所以是具有高度策略風險的產業,唯有掌握記憶體模組產業的特性並發揮我國所具有的優勢條件,才能在這個競爭激烈的產業中有立足之地。簡而言之,只要供需的微幅失衡,就十分容易造成價格的急劇波動,因此如何強化個案公司企業經營能力,擬定競爭策略,在這競爭激烈的市場上保持不墜,實為一大挑戰。本文利用限制驅導式(Drum-Buffer-Rope; DBR)排程法及先進規劃排程系統(APS, Advanced Planning & Scheduling System),來做為記憶體模組的測試製程的優化排程研究,結果在WIP(Work In Process)及工時控制方面皆有明顯改善。

並列摘要


DRAM is a capital intensive high tech business. Yet the price of DRAM is strongly influenced by cyclical cycles and other factors. For example, if an over-supply occurred, the price dropped sharply. On the other hand, if an over-demand happened, the price escalated several times. Therefore, to be success in this highly competitive business, it is important to grasp certain characteristics of the memory module industry. Namely, high production yield, short lead time and flexible production. In this paper, Theory of Constraints Drum-Buffer-Rope (Drum-Buffer-Rope; DBR) scheduling method and Advanced Planning and Scheduling System (APS) were used for the test schedule optimization process of the memory module. Results showed that both Work In Process and working hour control were improved significantly.

參考文獻


張建新(2003)。應用以限制理論為基礎之先進排程系統于連續製程之研究(碩士論文)。成功大學工業管理研究所。
陳信宏(2009)。供應網絡生產規劃模式─以記憶體模組產業為例(碩士論文)。東海大學工業工程與經營資訊研究所。
徐國智(2002)。產能限制下的混合式生產環境設計(碩士論文)。中原大學工業工程研究所。
陳伊誠(2006)。發展及運用先進規劃排程系統於生產作業之效益分析(碩士論文)。台灣科技大學工業管理系。
周德華(2001)。多目標迴流環境下之限制驅導式排程系統(碩士論文)。中央大學工業管理研究所。

延伸閱讀