In the metropolitan area with dense population, busy traffic and high-rising buildings, TRTS often adopt shield tunneling to ease the construction impact on citizens’ daily life and economy activities. However, it’s inevitable to cause the disturbances of ground during the process of shield- tunneling. Based on the project of CR280 in Xinyi Line of MRT, this article is to study the possible ground sinking and precaution methods by using drilling procedure management and safety instrumentation system during each stage of shield-tunneling. Also, we evaluate is discussing the connection among soil pressure and backfill grouting during construction. In the meantime, this article also shows the effect on the disturbances of ground subject to different parameters for construction. The result of this article provides the methods to determine management value of shield tunneling for future reference.