摘要


都會區在土地成本等因素之考量,為了更有效的土地利用,地下室進行深開挖施工也成為選項之ㄧ,然而台北盆地地質帶有軟弱黏土層, K1區出現深厚之軟弱黏土層,軟土潛變行為對開挖施工行為造成影響,開挖中之擋土設施除主體連續壁外,地中壁工法藉由兩側土壓力互相抵抗,抑止主體連續壁產生側向變位。 本文利用有限元素法PLAXIS 3D FOUNDATION三維數值分析軟體,配合軟土潛變模式進行分析,以地中壁為研究對象,利用監測數據以及數值分析結果,探討有效抑止連續壁體變位的地中壁設置方式,並藉由監測數據之驗證,提出軟土潛變分析在三維軟體中,減少分析時間之模擬方式。

關鍵字

地中壁 潛變 深開挖

並列摘要


The cost of land acquisition, amongst other factors, is always an important issue in urban areas. For more effective use of land, deep excavation is one of the options for substructures. However, the geological formation of Taipei Basin features mostly soft and weak clay. In K1 area, clay of soft and weak natures extends deep into underground formation, and the creep induced by soft clay creates profound impacts to excavations. For retaining structures during excavation, in addition to the main body of diaphragm wall, cross walls provide counter-balance of lateral soil pressure between both sides of excavation, keeping lateral displacement from forming in the diaphragm wall. PLAXIS 3D FOUNDATION, a 3-dimenstional analysis program using finite element method, was adopted in combination of creep model in soft soil in this study for analysis. With cross walls as study subject, monitoring data and analysis result were used to investigate the set-up of cross walls in excavation for effective suppression of lateral displacement in diaphragm wall. Also, a simulation of soft soil creep analysis with the verification of monitoring data was proposed for reduction of analysis time in 3D program.

並列關鍵字

Cross Wall Creep Deep Excavation

參考文獻


[6] C. Y. Ou, Y. L. Lin, P. G. Hsieh. (2006). “CASE RECORD OF AN EXCAVATION WITH CROSS WALLS AND BUTTRESS WALLS,” Journal of GeoEngineering, Vol. 1, No. 2, pp. 79-86, December 2006.
[20] Hsii-Sheng Hsieh, Yi-Chih Lu and Ting-Mei Lin. (2008). “EFFECTS OF JOINT DETAILS ON THE BEHAVIOR OF CROSS WALLS,” Journal of GeoEngineering, Vol. 3, No. 2, pp. 55-60, August 2008.
[29] Richard N. Hwang , Za-Chieh Moh , and C. H. Wang , (2007). PERFORMANCE OF WALL SYSTEMS DURING EXCAVATION FOR CORE PACIFIC CITY, Journal of GeoEngineering, Vol. 2, No. 2, pp. 53-60, August 2007.
[30] Richard N. Hwang and Za-Chieh Moh., (2008). “EVALUATING EFFECTIVENESS OF BUTTRESSES AND CROSS WALLS BY REFERENCE ENVELOPES,” Journal of GeoEngineering, Vol. 3, No. 1, pp. 1-11, April 2008.
[31] Richard N. Hwang and Za-Chieh Moh., (2008). PERFORMANCE OF FLOOR SLABS IN EXCAVATIONS USING TOP-DOWN METHOD OF CONSTRUCTION AND CORRECTION OF INCLINOMETER READINGS, Journal of GeoEngineering, Vol. 2, No. 3, pp. 111-121, December 2007.

被引用紀錄


林于茹(2016)。軟弱地盤中樁筏基礎構造之靜態力學行為〔碩士論文,淡江大學〕。華藝線上圖書館。https://doi.org/10.6846/TKU.2016.00887
鄭逸民(2011)。邊坡穩定之數值分析-以猴山岳為例〔碩士論文,國立臺北科技大學〕。華藝線上圖書館。https://www.airitilibrary.com/Article/Detail?DocID=U0006-1808201117471300
鄭郁翰(2014)。路塹橋墩深基礎開挖PLAXIS 3D模擬分析〔碩士論文,國立臺北科技大學〕。華藝線上圖書館。https://www.airitilibrary.com/Article/Detail?DocID=U0006-2208201413004700

延伸閱讀