應用品質管制方法以避免銷售不合格品給顧客是一個必要的工作,適當的 檢驗對於生產系統而言非常重要。本研究考慮一般性的檢驗站設置問題, 包含串連式與並連式生產系統。其中串連式生產系統可以視為並連式生產 系統的特例。我們允許生產的加工順序可以未知、每一檢驗站設置時可以 從多種檢驗設備中選擇。在本研究中,檢驗站設置問題是在限制檢驗站站 數與輸出不合格品率的條件下,求出加工順序與檢驗站的設置位置,使得 總製造成本最低。總製造成本包括固定及變動的加工成本、檢驗成本、物 料搬運成本、內部失敗成本及外部失敗成本。在以前的研究多以動態規劃 法、0-1 整數規劃法或是非線性規劃法求解檢驗站設置問題。然而上述方 法在求解問題規模稍微大時就會因需要大量的計算時間而變得不可行。本 研究使用模擬退火演算法求解檢驗站設置問題,此演算法可以在有效的計 算時間內求得一最佳解或近似最佳解。

並列摘要


In a production system, it is necessary to apply quality control methods to prevent the nonconforming products from reaching the customers. Appropriate inspection is a significant component of production systems. Determination of appropriate inspection allocations becomes an interesting research topic. In this research, we formulate a general inspection problem, both for a serial and a nonserial manufacturing system. Serial production systems may be viewed as a special case of nonserial production systems. We extended the treatment of the inspection allocation problem to address the following conditions: (1) the order of production operations does not have to be known in advance (2) there are several inspection facilities available to each inspection point. Traditionally, dynamic programming, 0-1 integer programming or non-linear programming techniques are used to solve inspection allocation problem. However, a problem using these techniques is that the computation time becomes prohibitively large when the number of potential inspection stations are twenty or more. In the current research, inspection allocation models are formulated with the objective of determining the number and location of inspection stations which will minimize the expected total cost per unit produced. The total cost includes fixed and variable processing cost, inspection cost, material handling cost, internal failure costs (repair, replacement, scrap, and rework) and external failure costs. In this research, we apply the simulated annealing algorithm to solve the inspection allocation problem. A comparison shows that the simulated annealing algorithm is a promising approach to solve inspection allocation problem.

被引用紀錄


黃正谷(2009)。組裝業生產系統品檢設置問題之研究 —以手機按鍵製造為例〔碩士論文,中原大學〕。華藝線上圖書館。https://doi.org/10.6840/cycu200901233

延伸閱讀