應用專案生產力來分析不同功能點計算方法

Using Productivity of Different Type Projects to Analyze Function Point Calculations

指導教授 : 留忠賢

摘要


功能點常被用在專案開發的時候,用來估計專案規模的指標,因其與語言無關,所以也可以用於生產力的評估與分析。在本文中我們使用IFPUG[1]、COSMIC[2]和MK II[3]三種方法來估算專案大小,並搜集三個專案工時,對之來進行迴歸分析,用來檢驗功能點與工時的相關性。分析的結果發現功能點的估算在有一定的流程和架構的專案中,採用IFPUG和COSMIC的預測是比較好的,而在沒有一定的流程和架構的專案中,則是採用MK II得到的預測結果比較好。

關鍵字

COSMIC MK II 生產力 IFPUG

並列摘要


Function point is usually used to estimate the scale of a project during early stage of project development. Because it is language-independent, it could also be used for the assessment and analysis of productivities. In this thesis, we used three methods to estimate the project size: 1. IFPUG, 2. COSMIC, and 3. MK II. We also collected the work efforts of three different projects. We used linear regression to analyze the relationship between function point and work efforts. From the results of analysis, we found that for projects with more stable process and more organized structure, IFPUG and COSMIC are better predictors. Otherwise, MK II makes better prediction of efforts.

並列關鍵字

productivity MK II COSMIC IFPUG

參考文獻


[2] COSMIC, The COSMIC Functional Size Measurement Method Measurement Manual, Version 3.0.1, May 2009.
[6] Sean Furey, Why We Should Use Function Points. IEEE Software, Vol. 14, No. 2, pp. 28–29, Mar./Apr. 1997.
[8] Sungjoo Kang and Okjoo Choi and Jongmoon Baik, Model-based Dynamic Cost Estimation and Tracking Method for Agile Software Development. 2010 IEEE/ACIS 9th International Conference on Computer and Information Science, pp. 743–748, Aug. 2010.
[9] Kusumoto, S., Imagawa, M., Inoue, K., Morimoto, S., Matsusita, K. and Tsuda, M., Function Point Measurement from Java Programs. Proceedings of the 24th International Conference on Software Engineering(ICSE 2002), pp. 576–582, May 2002.
[11] 李正源, SPSS for Windows 統計分析與應用, Sep. 1997.

延伸閱讀