透過您的圖書館登入
IP:3.144.143.31
  • 學位論文

以數學規劃求解半導體封裝廠前段製程排程問題之研究

A Study of Applying Mathematical Programming to Solve the IC Package Front-End Process Scheduling Problem

指導教授 : 陳平舜
若您是本文的作者,可授權文章由華藝線上圖書館中協助推廣。

參考文獻


IBM. (2021). https://www.ibm.com/tw-zh/products/ilog-cplex-optimization-studio.
Changyu Chena. Hybrid tabu search algorithm for unrelated parallel machine scheduling in semiconductor fabs with setup times, job release, and expired times. Singapore Management University, Singapore. 2022.
Peng-Sen Wang. Lean-pull strategy for order scheduling problem in a multi-site semiconductor crystal ingot-pulling manufacturing company. Department of Industrial Management and Information. 2018.
Dominik Kress. Semiconductor final-test scheduling under setup operator constraints. Helmut Schmidt University. 2022.
Jihong Pang. A scatter simulated annealing algorithm for the bi-objective scheduling problem for the wet station of semiconductor manufacturing. College of Mechanical and Electronic Engineering. 2018.

延伸閱讀