影響BOT案成功之因素探討以污水下水道工程為例

FACTORS AFFECTING THE SUCCESS OF BOT PROJECT FOR SEWERAGE CONSTRUCTION

指導教授 : 黃然 翁在龍
若您是本文的作者,可授權文章由華藝線上圖書館中協助推廣。

摘要


污水下水道工程以BOT方式辦理,可減少政府財務支出及提升污水下水道建設的效率,目前台灣在36個公告招商案件中,簽約執行僅6處,顯示推動BOT案仍存障礙,本研究主要目的為探討影響BOT污水下水道專案成功之關鍵因素。 依據文獻回顧及使用特性要因法擬定影響因素,問卷依此設計並發送具BOT實務之專業人士填寫,使用SPSS統計軟體驗證問卷結果的信度與效度,並藉由AMOS統計軟體建構結構方程模型及依分析結果將影響因素依序列出。 研究結果顯示影響BOT污水下水道專案成功之關鍵因素分為四個階段,分別為招商階段「招商資訊透明化」,興建階段「興建用地取得時程」,營運階段「服務水準及環境品質的提升」,移轉階段「移轉前有充足的準備時程」,而在全週期階段最重要的因素為「強力的政府支持」。

關鍵字

問卷調查 特性要因法 信度 效度

並列摘要


The sewerage construction project conducted using build-operate-transfer (BOT) policy would reduce the governmental expense and increase the efficiency of construction procedure. However, only six contracted BOT sewerage projects out of thirty-six planned sewerage projects have been carried out in Taiwan. Many obstacles still exist in attracting civil companies to take part in the BOT project. This study is aimed to investigate the key factors affecting the success of BOT sewerage project. Draft affecting factors were obtained based on the results of literature review and cause-effect method. Questionnaire was designed and sent to the professional who has involved in the BOT project. Statistics package for social science (SPSS) was utilized to verify the reliability and validity of the questionnaire survey results. In addition, the structural equation modeling was built and the ranking of affecting factors was determined using analysis moment structures (AMOS) software. The key factors affecting the success of BOT sewerage project are divided into four stages: (1) investment invitation stage “transparent public information”, (2) construction stage “the schedule of land acquisition”, (3) operation stage “improve and enhance the environment quality”, and (4) transfer stage “proper preparation schedule before transfer”. The most important factor is the encouragement and support of local government through whole BOT project.

參考文獻


【5】行政院公共工程委員會,促進民間參與公共建設政策白皮書,pp.7-8,2008年9月22日。
【6】黃崇哲,「我國促參推動的歷程、課題與展望」,台灣經濟研究月刊,第29卷第9期,pp.19-20,2006。
【7】促進民間參與公共建設法,2001年10月31日。
【8】促進民間參與公共建設法施行細則,2003年8月13日。
【18】徐肇章、莊志慧等,「民間參與公共建設可行性評估及先期規劃作業手冊」,鼎漢國際工程顧問股份有限公司,90年12月。

延伸閱讀