gn this project, the partial shedding techniques for the centrifugal and large screw chillers Monitored and controlled by a building automation (BA) system will be developed. Coordinated with the BA system, the partial shedding techniques will be investigated so that the BA system is able to detect the shedding request from Taipower. The control sequence of a BA system will be wodified to allow partial shedding of the controlled chillers. The load of a water chillers will be partially shed down to 50% of the waximum. As the shedding is over, the original load is restored. The same shedding/restore control will repeat several times a day with certain control periods.