Inclined tube was one of the landslide frequently monitoring instruments, but due to the installs process or stratum sliding change complexity, many observation result were not ideal, even affects the following interpretation work. This paper mainly uses inclined tube to dislodge and discusses the change of large-scale landslide situation in Shan-Zong-Liao area, to carry on the evaluation by the suggestion value of related datum and clearly define main displacement situation and distribution area in Shan-Zong-Liao landslide. Assisting by the scene drilling and the groundwater investigation to generalize analysis evaluation to propose region of the landslide improvement priority facility and reduce influence of once more migration. Analysis result show, the relative displacement is obvious above the landslide region and the groundwater is also high by the forehead. Suggestion establishment sunk basin and cross drainage in this area to reduces the groundwater influence and observe its stability continually.