|
Jongsoo Kim, Robert C., Leachman, and Byungkyoo Suh (1996), “Dynamic Release Control Policy for the Semiconductor Wafer Fabrication Lines”, The journal of the Operational Research Society, Vol. 47, No. 12 (Dec., 1996), 1516-1525. Leachman, R.C., Solorzano, M., and Glassey, C.R. (1988), A Queue Management Policy for the Release of Factory Work Orders, Eng. Systems Research Center, University of California, Berkeley. rep. no. 88-19. Scholl, W. and Domaschke, J. (2000), “Implementation of modeling and simulation in semiconductor wafer fabrication with time constraints between wet etch and furnace operations”, IEEE Transactions on Semiconductor Manufacturing, Vol. 13. No. 3, pp. 273–277. Robinson, J.K. and Giglio, R. (1999), Capacity Planning for Semiconductor Wafer Fabrication with Time Constraints Between Operations, Simulation Conference Proceedings, 1999. Winter, Phoenix, A.Z., USA, Vol. 1, pp. 880-887. 蔡啟聰 (1996),晶圓製造廠考慮等候時間限制之派工策略,交通大學工業工程研究所碩士論文。 涂漢威 (2005),晶圓製造廠考慮等候時間限制之批量放行法則,清華大學工業工程與工程管理研究所碩士論文。
|