|
1. 王凱生,“訂單滿足流程與可允若量分配模式 - 以TFT-LCD產業為例”,國立清華大學工業工程與工程管理學系碩士論文,2007。 2. 示欣惠,“二階層多廠區產能規劃 - 以TFT-LCD產業為例”,國立清華大學工業工程與工程管理學系碩士論文,2008。 3. 洪婉如,“供應鏈網路之生產規劃問題 - 以TFT-LCD產業為例”,國立清華大學工業工程與工程管理學系碩士論文,2008。 4. 陳盈彥,“階層式多廠區生產鏈規劃之研究 - 以TFT-LCD產業為例”,國立清華大學工業工程與工程管理學系博士論文,2007。 5.張益菁,“考量需求不確定之單皆多廠產能規劃問題 - 以TFT - LCD廠為例”, 國立清華大學工業工程與工程管理學系碩士論文,2007。 6.溫伊婷,“拉式多階多廠之訂單滿足問題 - 以TFT - LCD廠為例”,國立清華大學工業工程與工程管理學系碩士論文,2008。 7.謝志祥,“供應鏈管理之主規劃排程演算法-以最短路徑演算法滿足所有訂單需求”,國立台灣大學資訊管理研究所碩士論文,2000。 8.劉基全,“多層上下游生產環境下多廠區生產規劃問題之研究”,國立台灣大學商學研究所博士論文,2003。 9.Azevedo A.L., and Sousa J.P.,“A component-based approach to support order planning in a distributed manufacturing enterprise”, Journal of Materials Processing Technology, 107, pp.431-438, 2000. 10.Ahn, H-S., and Kaminsky, P.,“Production and distribution policy in two stage stochastic push-pull supply chain”, Institute of Industrial Engineers Transactions, 37, pp.609-621, 2005. 11.Beamon, B.M.,“Supply chain design and analysis: Models and methods”, International Journal of Production Economics, 55, pp. 281-294, 1998. 12.Bhatnagar, R., Chandra, P., and Goyal, S.K.,“Modles for multi-plant coordination”, European Journal of Operational Research, 67, pp.141-160, 1993. 13.Bruns, R. and Sauer, J.,“Knoeledge-Based Multi-Site Coordination and Scheduling”, in: Schraft, R. D. et al.(Eds.): Flexible Automation and Intelligent Manufacturing 1995, S. 115-123, Begell House, 1995. 14.Chern, C.C., and Hsieh, J.S.,“A heuristic algorithm for master planning that satisfies multiple objectives”, Computers & Operations Research, 34, pp. 3491-3515, 2007. 15.Cheristian, H.T., and Kallrath, J.,“Optimal planning in large multi-site Production Networks”, European Journal of Operational Resaerch, 126, pp.422-435, 2000. 16.Grunow, M., Gunther, H.O., and Lehmann, M.,“Campaign planning for multi-stage batch processes in the chemical industry”, OR Spectrum, 24, pp. 281-314, 2002. 17.Grunow, M., Gunther, H.O., and Yang, G.,“Plant co-ordination in pharmaceutics supply networks”, OR Spectrum, 25, pp. 109-141, 2003. 18.Guinet, A.,“Multi-site planning: A transshipment problem”, International Journal of Production Economics, 74, pp. 21-32, 2001. 19.Harland, C.,“Supply chain operational performance roles”, Integrated Manufacturing Systems, 8, pp. 70-78, 1997. 20.Ioannou, G.,“Streamlining the supply chain of the Hellenic sugar industry”, Journal of Food Engineering, 70, pp. 323-332, 2005. 21.Kaminsky, P., and Simch-Levi, D.,“Production and distribution lot sizing in a two stage supply chain”, Institute of Industrial Engineers Transactions, 35, pp.1065-1075, 2003. 22.Kehoe, D. and Boughton, N.,“Internet based supply chain management-A classification of approaches to manufacturing planning and control”, International Journal of Operation and Production Management, 21, pp. 516-524, 2001. 23.Lee, Y.H.,“Supply Chain Model for the Semiconductor Industry of Global Market”, Journal of Systems Integration, 10, pp.189-206, 2001. 24.Lin, J.T., and Chen, Y.Y.,“A multi-site supply network planning problem considering variable time buckets – A TFT-LCD industry case”, International Journal of Advanced Manufacturing Technology, 33, pp.1031-1044, 2007. 25.Lin, J.T., Chen, T.L., and Lin, Y.T.,“Critical material planning for TFT-LCD production industry”, International Journal of Production Economic, 2009. 26.Min, H. and Zhou, G.,“Supply chain modeling: past, present and future”, Computer & Industrial Engineering, 43, pp.231-249, 2002. 27.Pibernik, R., and Sucky, E.,“An approach to inter-domain master planning in supply chains”, International Journal of Production Economics, 108, pp. 200-212, 2007. 28.Rudberg, M. and Olhager, J.,“Manufacturing networks and supply chains: an operations strategy perspective”, Omega, 31, pp. 29-39, 2003. 29.Sambasivan, M., and Yahya, S.,“A Lagrangean-based heuristic for multi-plant, multi-tem, multi-period capacitated lot-sizing problems with inter-plant transfers”, Computer & Operations Research, 32, pp. 537-555, 2005. 30.Schneeweiss, D., and Zimmer, K.,“Hierarchical coordination mechanisms within the supply chain”, European Journal of Operational Research, 153, pp.687-703, 2004. 31.Simch-Levi, D., Kaminsky, P., and Simch-Levi, E., Designing and managing the supply chain: concepts, strategies and case studies, 3rd ed., McGraw-Hill, 2008. 32.Simpson, N.C., and S. Selcuk Erenguc S.S.,“Modeling the order picking function in supply chain systems: formulation, experimentation, and insights”, Institute of Industrial Engineers Transactions, 33, pp.119-130, 2001. 33.Soman, C.A., Donk, D.P., and Gaalman, G.J.C.,“Capacitied planning and scheduling for combined make-to-order and make-to-stock production in the food industry: An illustrative case study”, International Journal of Production Economic, 108, pp.191-199, 2007. 34.Timpe, C.H., and Kallrath, J.,“Optimal planning in large multi-site production networks”, European Journal of Operational Research, 126, pp. 422-435, 2000. 35.Yimer, A.D., and Demirli, K.,“A genetic approach to two phase optimization of dynamic supply chain scheduling”, Computer & Industrial Engineering, 2009.
|