|
[1] 示欣惠,「二階層多廠區產能規劃-以TFT-LCD產業為例」,國立清華大學工業工程與工程管理學系碩士論文,2008。 [2] 林則孟,陳子立,陳韋均,「TFT Array多廠區之產能與產品組合規劃問題」,中國工業工程學會九十五年度年會暨學術研討會,2006。 [3] 周俐君,「晶圓代工多廠區之中期產能規劃問題」,國立清華大學工業工程與工程管理學系碩士論文,2008。 [4] 陳韋均,「TFT Array多廠區之產能與產品組合規劃問題」,國立清華大學工業工程與工程管理學系碩士論文,2006。 [5] 張益菁,「考慮需求不確定之單階多廠產能規劃問題-以TFT-LCD產業為例」,國立清華大學工業工程與工程管理學系碩士論文,2007。 [6] Balachandran, B. V., Balakrishnan, R. and Sivaramakrishnan, K., “Capacity planning with demand uncertainty”, The Engineering Economist, 43(1), pp.49-72, 1997. [7] Catay, B., Erenguc, S. S. and Vakharia, A. J., “Tool capacity planning in semiconductor manufacturing”, Computers and Operations Research, 30, pp.1349-1366, 2003. [8] Chou, Y. C., Cheng, C. T., Yang, F. C. and Liang, Y. Y., “Evaluating alternative capacity strategies in semiconductor manufacturing under uncertain demand and price scenarios”, International Journal of Production Economics, 105, pp.591-606, 2007. [9] Christie, R. M. E. and Wu, S. D., “Semiconductor capacity planning: stochastic modeling and computational studies”, IIE Transactions, 34, pp. 131-143, 2002. [10] Hood, S. J., Bermon, S. and Barahona, F., “Capacity Planning under Demand Uncertainty for Semiconductor Manufacturing”, IEEE Transactions on Semiconductor Manufacturing, 16(2), pp.173-280, 2003. [11] Karabuk, S. and Wu, S. D., “Coordinating Strategic Capacity Planning in the Semiconductor Industry”, Operations Research, 51(6), pp.839-849, 2003. [12] Liang, Y. Y. and Chou, Y. C., “Option-based Capacity Planning for Semiconductor Manufacturing”, 2003 IEEE International Symposium on Semiconductor Manufacturing, pp.77-80, 2003. [13] Lim, S. K. and Kim Y. D., “An Integrated Approach to Dynamic Plant Location and Capacity Planning”, The Journal of the Operation Research Society, 50(12), pp.1205-1216, 1999. [14] MirHassani, S. A., Lucas, C., Mitra, G., Messina, E. and Poojari, C. A, “Computational solution of capacity planning models under uncertainty”, Parallel Computing, 26(5), pp. 511-538, 2000. [15] Wang, K. J. and Lin, S. H, “Capacity expansion and allocation for a semiconductor testing facility under constrained budget”, Production Planning & Control, 13(5), pp.429-437, 2002. [16] Yilmaz, P. and Catay, B., “Strategic Level Three-stage Production Distribution Planning with Capacity Expansion”, Computer & Industrial Engineering, 51, pp.609-620, 2006.
|