|
1. 張怡筠,「CPFR中滾動式預測的關鍵因子探討」,國立清華大學資訊系統與應用所碩士論文,2006。 2. 陳昭廷,「CPFR協同預測中之承諾機制的影響因子分析」,國立清華大學工業工程管理學所碩士論文,2007。 3. 謝依潔,「供應鏈滾動預測與訂單策略之模擬研究」,國立中央大學資訊管理學系碩士論文,2007。 4. 李建勳,「供應商管理庫存下之預測補貨策略」,國立清華大學工業工程管理學所碩士論文,2008。 5. 蔡志宏,「預測補貨策略對供應商成本之影響評估」,國立清華大學工業工程管理學所碩士論文,2009。 6. Alexander, E. E., J. C. Taylor and P. J. Daugherty. “Automatic replenishment programs and level of involvement: performance implications”, International Journal of Logistics Management, 10(1), pp.25-36, 1999 7. Axsäter, S. and Rosling, K., “Multi-level production-inventory control: Material requirements planning or reorder point policies”, European Journal Operational Research, 75, pp.405-412, 1994 8. Babaï, M. X., Syntetos, A. A., Dallery, Y. and Nikolopoulos, K., “Dynamic re-order point inventory control with lead-time uncertainty: analysis and empirical investigation”, International Journal of Production Research, 47(9), pp.2461-2483, 2009 9. Babaï , M.Z. and Dallery, Y., “Inventory Management : Forecast Based Approach vs. Standard Approach”, International Conference on Industrial Engineering and Systems Management, 2005 10. Bradley, J. R. and Arntzen, B. C., “The simultaneous planning of production, capacity, and inventory in seasonal demand environments”, Operations Research, 47(6), pp. 795-806, 1999 11. Bregman, R. L., “An analytical framework for comparing material requirements planning to reorder point systems”, European Journal Operational Research, 75, pp.74-88, 1994 12. Chakravorty, S.S., “A simulation study of the performance of a multi-echelon production distribution system with feedback and feedforward controls”, Unpublished doctoral dissertation, University of Georgia, Georgia, 1992 13. Chen, F., Z. Drezner, J. K. Ryan, D. Simchi-Levi, “Quantifying the bullwhip effect in a simple supply chain: The impact of forecasting, lead times, and information” , Management Science, 46(3), pp.436-443, 2000 14. Croston, J. D., “Forecasting and stock control for intermittent demands”, Operational Research Quarterly, 23(3), pp.289-303, 1972 15. Dengiz, B., Bektas, T. and Ultanir, A. E., “Simulation optimization based DSS application: A diamond tool production line in industry”, Simulation Modeling Practice and Theory, 14, no. 3, pp. 296-312, 2006 16. De Toni, A.F. and Zamolo, E, ” From a traditional replenishment system to vendor-managed inventory: A case study from the household electrical appliances sector”, International Journal of Production Economics, 96(1), pp.63-79, 2005 17. Eaves, A. H. C. and Kingsman, B. G., “Forecasting for the ordering and stockholding of spare parts”, Journal of the Operational Research Society, 55, pp.431-437, 2004 18. Ehrhardt, R., ”The power approximation for computing (s, S) inventory policies” , Management Science, 25(8), pp.777-786, 1979 19. Ehrhardt, R. and Mosier, C., “A revision of the power approximation for computing (s, S) policies”, Management Science, 30,(5), pp.618-622, 1984 20. Enns, S. T., ”PULL” Replenishment performance as function of demand rate and setup times under optimal settings”, Proceedings of the 2007 Winter Simulation Conference, 2007 21. Gallego, G. and Özer, Ö., ”Integrating replenishment decisions with advance demand information”, Management Science, 47(10), pp.1344-1360, 2001 22. Grewal, C. S., Rogers, P. and Enns, S. T., ”Simulation optimization of supply chain replenishment strategies using OptQuest”, Proceedings of the 2008 Winter Simulation Conference, 2008 23. Robins, G. “Pushing the limits of VMI”, Stores, 77(3), pp.42-44, 1995 24. Harris, F. W., ”How Many Parts to Make at Once”, Factory: The Magazine of Management, 10(2), pp.135-136, 1913 25. Hautaniemi, P. and Pirttila, T., “ The choice of replenishment policies in an MRP environment“, International Journal of Production Economics, 59, pp. 85-92, 1999 26. Jacobs, F. R and Whybark, D. C., ”A comparison of reorder point and material eequirements planning inventory control logic”, Decision Sciences, 23(2), pp.332-342, 1992 27. Karimi, B., Fatemi Ghomi, S. M. T. and Wilson, J. M., “The capacitated lot sizing problem: A review of models and algorithms”, International Journal of Mangement Science, 31, pp.365-378, 2003 28. Kazim, S., “On the benefits of CPFR and VMI: A comparative simulation study”, International Journal of Production Economics, 113, pp.575-586, 2008 29. Keaton, M., “Inventory control under gamma demand and stochastic lead time” Journal of Business Logistics, 16 (1), pp.107-131, 1995 30. Keh, H. T. and Seong, Y. P., “To market: The changing face of grocery retailing”, Long Range Planning, 30(6), pp.836-846, 1997 31. Kuk, G., ” Effectiveness of vendor-managed inventory in the electronics industry: determinants and outcomes”, Information & Management, 41, pp.645-654, 2004 32. Lau, J. S. K., G. Q. Huang and K. L. Mak, “Impact of information sharing on inventory replenishment in divergent supply chains”, International Journal of Production Research, 42(5), pp.919-941, 2004 33. Montgomery, D. C., “Design and Analysis of Experiments”, New York : Wiley, 2005 34. Nieboer, R.A.J.J. and Dekker, R., “Brownian motion approximations for tankage assessment and stock control”, European Journal of Operational Research, 85, pp.192-204, 1995 35. Nordhasu, W., “Forecasting efficiency: concepts and applications”, Review of Economics and Static 69,667-674, 1987 36. Orlicky, J., “Material Requirements Planning”, New York: McGraw Hill, 1975 37. Ouyang, L. Y., K. S. Wu and C. H. Ho,” An integrated vendor–buyer inventory model with quality improvement and lead time reduction”, International Journal of Production Economics , 108(1-2), pp.349-358, 2007 38. Piplani, R. and Viswanathan, S., ”A model for evaluating supplier-owned inventory strategy”, International Journal of Production Economics, 81-82, pp.565-571, 2003 39. Pohlen, T. L. and Goldsby, T. J., “VMI and SMI programs: How economic value added can help sell the change”, International Journal of Physical Distribution & Logistics Management, 33(7), pp.565-581, 2003 40. Reid, R.D., “A comparative analysis of inventory planning systems in a multi-echelon, multiproduct distribution system supplied by a limited capacity manufacturer”, Unpublished doctoral dissertation, Ohio State University, Ohio, 1987 41. Rees, L. P., Huang, P. Y. and Taylor, B. W., “A comparative analysis of an MRP lot-for-lot system and a Kanban system for a multistage production operation”, International Journal of Production Research, 27, pp.1427-1443, 1989 42. Ritzman, L. P. and Krajewski, L. J., “Comparisons of material requirements planning and reorder point systems”, Simulation Councils Proc. Series, 12, pp.47-54, 1983 43. Ruud, T. and Laura, D., “Forecasting intermittent demand”, Lancaster University Management School, Working Paper, UK, 2006 44. Ryan, M., “CRP spells survival”, Progressive Grocer, 73(8), pp.28-34, 1994 45. Sani, B. and Kingsman, B. G., “Selecting the best periodic inventory control and demand forecasting methods for low demand items”, Journal of the Operational Research Society, 48, pp.700-713, 1997 46. Sugimori, Y., Kusunoki, K., Cho, F. and Uchikawa S., “Toyota production system and kanban system materialization of just-in-time and respect-for-human system”, International Journal of Production Research, 15(6), pp.553-564, 1977 47. Silver, E. A. and Meal, H. C., “A heuristic for selecting lot size quantities for the case of a deterministic time-varying demand rate and discrete opportunities for replenishment”, Production & Inventory Management, 14(2), pp.64-74, 1973 48. Silver, E. A., Pyke, D. F. and Petetson, R., “Inventory Management and Production Planning and Scheduling”, New York: Wiley, 1998 49. Suwanruji, P. and Enns, S.T., “Information and logic requirements for replenishment systems”, International Journal of Operations and Quantitative Management, 8, pp.149-164, 2002 50. Suwanruji, P. and Enns, S.T., “Comparison of supply chain replenishment strategies in an uncapacitated distribution system”. International Journal of Risk Assess & Manage, forthcoming, 2005 51. Suwanruji, P. and Enns, S.T., “Evaluating the effects of capacity constraints and demand patterns on supply chain replenishment strategies”, International Journal of Production Research., 44(21), pp.4607-4629, 2006 52. Hosoda, T. and Disney, S. M. “On variance amplification in a three-echelon supply chain with minimum mean square error forecasting”, International Journal of Management Science, 34, pp.344-358, 2006 53. Teunter, R. H. and Duncan, L., “Forecasting demand for slow moving inventory”, Research Report, Lancaster University Management School, 2006 54. Tiacci, L. and Saetta, S., ”An approach to evaluate the impact of interaction between demand forecasting method and stock control policy on the inventory system performances”, International Journal of Production Economics, In Press, Corrected Proof, Available online, 2008 55. Van Norden, L. and Van de Velde, S., ”Multi-product lot-sizing with a transportation capacity reservation contract”, European Journal of Operational Research, 165, pp.127-128, 2005 56. Wilson, R. H., “A scientific routine for stock control”, Harvard Business Review, 13(1), pp.116-128, 1934 57. Wagner, H. M. and Whitin, T. M., “Dynamic version of the economic lot size model”, Management Science, 5(1), pp.88-96, 1958 58. Wallace, J. H. and Mark, L. S., ”Factory Physics”, McGraw: Hill, 2001 59. Yang, K.K., “A comparison of reorder point and kanban policies for a single machine production system”, Production Planning & Control, 9, pp.385-390, 1998 60. Zhao, X., Xie, J. and Lau, R. S. M., “Improving the supply chain performance: use of forecasting models versus early order commitments”, International Journal of Production Research, 39(17), pp.3923-3939, 2001 61. Zhao, X., Xie, J. and Leung, J., “The impact of forecasting model selection on the value of information sharing in a supply chain”, European Journal of Operational Research, 142, pp.321-344, 2002 62. Zhao, X. and Xie, J., “Forecasting errors and the value of information sharing in a supply chain”, International Journal of Production Research, 40(2), pp.311-335, 2002 63. Zhao, X., Xie, J. and Zhang, W.J., “The impact of information sharing and ordering co-ordination on supply chain performance”, Supply Chain Management: An International Journal, 7(1), pp.24-40, 2002 64. Zotteri, G., “The impact of distributions of uncertain lumpy demand on inventories” , Production Planning & Control, 11(1), pp.32- 43, 2000
|