|
陳韋均,「TFT Array 多廠區之產能與產品組合規劃問題」,國立清華大學工業 工程與工程管理學系碩士論文,2006。 2. 胡婉琪,「TFT-LCD 面板業之需求預測方法論」,國立清華大學工業工程與工 程管理學系碩士論文,2006。 3. 張益菁,「考慮需求不確定之單階多廠產能規劃問題─以TFT-LCD 產業為 例」,國立清華大學工業工程與工程管理學系碩士論文,2007。 4. 示欣惠,「二階層多廠區產能規劃─以TFT-LCD 產業為例」,國立清華大學工 業工程與工程管理學系碩士論文,2008。 5. 李依玲,「多產品隨機價量函數下之動態產能規劃」,國立台灣大學工業工程學 研究所碩士論文,2009。 6. 朱曉晴,「考量需求不確定之隨機動態產能規劃─以TFT-LCD 產業為例」國立 清華大學工業工程與工程管理學系碩士論文,2009。 7. Ahmed, S, “Semiconductor Tool Planning via Multi-Stage Stochastic Programming”, Proceedings of 2000 International Conference on Modeling and Analysis of Semiconductor Manufacturing, pp.153-157, 2002. 8. Ahmed, S. and Garcia, R., “Dynamic Capacity Acquisition and Assignment under Uncertainty”, Annals of Operations Research, 124, pp. 267-283, 2004. 9. Ahmed, S. and Sahinidis, N. V., “An Approximation Scheme for Stochastic Integer Programs arising in Capacity Expansion”, Operations Research, 51(3), pp.461-471, 2003. 10. Ayuso, A. A., Escudero, L. F., Grain, A., Ortuno, M. T. and Perez, G., “An Approach for Strategic Supply Chain Planning under Uncertainty based on Stochastic 0-1 Programming”, Journal of Global Optimization, 26, pp.97-124, 2003. 11. Ayuso, A. A., Escudero, L. F., Grain, A., Ortuno, M. T. and Perez, G., “On the Product Selection and Plant Dimensioning Problem under Uncertainty”, Omega, 33, pp.307-318, 2005. 12. Barahona, F., Bermon, S., Gunluk, O. and Hood, S., “Robust Capacity Planning 104 in Semiconductor Manufacturing”, Naval Research Logistics, 52, pp.459-468, 2005. 13. Balachandran, B. V., Balakrishnan, R. and Sivaramakrishnan, K., “Capacity Planning with Demand Uncertainty”, The Engineering Economist, 43(1), pp.49-72,1997. 14. Bermon, S. and Hood, S. J., “Capacity Optimization Planning System”, Interface, 15. Bhatnager, S., Gaucherand, E. F., Fu, M. C., He, Y. and Marcus, S. I., “A Markov Decision Process Model for Capacity Expansion and Allocation”, Proceedings of the 38th Conference on Decision & Control, pp.1380-1385, 1999. 16. Biller, S., Muriel, A., & Zhang, Y. , “ Impact of Price Postponement on Capacity and Flexibility Investment Decisions. ”, Society, 15(2), 198 -214,2006. 17. Birge, J. R. and Louveaus, F., “Introduction to Stochastic Programming”, Springer-Verlag, 1997. 18. Bok, J. K., Lee, H. and Park, H., “Robust Investment Model for Long-range Capacity Expansion of Chemical Processing Networks under Uncertain Demand Forecast Scenarios”, Computers & Chemical Engineering, 2(7-8),pp.1037-1049, 1998. 19. Blackhurst, J., Wu, T. and O’grady, P., “Network-Based Approach to Modeling Uncertainty in A Supply”, International Journal of Production Research, vol.42, no.8, 1639-1658, 2004. 20. Carrion, M., Philpott, A. B., Conejo, A. J. and Arroyo, J. M., “A Stochastic Programming Approach to Electric Energy Procurement for Large Consumers”, IEEE Transaction on Power System, vol.22, no.2, 2007. 21. Catay, B., Erenguc, S. S. and Vakharia, A. J., “Tool Capacity Planning in Semiconductor Manufacturing”, Computers and Operations Research, 30, pp.1349-1366, 2003. 22. Chen, Z. L., Li, S. and Triupati, D., “A Scenario-Based Stochastic Programming Approach for Technology and Capacity Planning”, Computers & Operations Research, 29, pp.781-806, 2002. 23. Chen, T. L., Lin, J. T., and Fang, S. C., “A Novel Shadow-Price Based Heuristic 105 for Multi-Site Capacity Planning in the TFT-LCD Manufacturing Industry”, Working paper, 2008. 24. Chou, Y. C., Cheng, C. T., Yang, F. C. and Liang, Y. Y., “Evaluating Alternative Capacity Strategies in Semiconductor Manufacturing under Uncertain Demand and Price Scenarios”, International Journal of Production Economics, 105, pp.591-606, 2007. 25. Christie, R. M. E. and Wu, S. D., “Semiconductor Capacity Planning: Stochastic Modeling and Computational Studies”, IIE Transactions, 34, pp. 131-143, 2002. 26. Cheng, L., Subrahmanian, E. and Westerberg, A. W., “Multi-Objective Decisions on Capacity Planning and Production-Inventory Control under Uncertainty”, Industry Engineering and Chemical Research, 43, 2192-2208, 2004. 27. Choi, J., Realff, M. J. and Lee, J. H., “Stochastic Dynamic Programming with Localized Cost-to-go Approximators: Application to Large Scale Supply Chain Management under Demand Uncertainty”, Chemical Engineering Research and Design, 83(A6), 752-758. 28. Choi, J. , Realff, M. J. and Lee, J. H., “Dynamic Programming in a Heuristically Confined State Space: A Stochastic Resource-Constrained Project Scheduling Application”, Computers and Chemical Engineering, 28, 1039-1058, 2004. 29. Domenica, N. D., Lucas, C., Mitra, G. and Valente, P., “Scenario Generation for Stochastic Programming and Simulation: A Modeling Perspective”, IMA Journal of Management Mathematics, pp.1-38, 2007. 30. Eppen, G. D., Martin, R. K. and Schrage, L., “A Scenario Approach to Capacity Planning”, Operations Research, 37(4), pp.517-527, 1989. 31. Escudero, L. F., Kamesam, P. V., King, A. J. and Wets, R. J. B., “Production Planning via Scenario Modeling”, Annals of Operations Research, 43, pp.311 - 335, 1993. 32. Froot, K. a., Scharfstein, D. S., & Stein, J. C. (1993). Risk Management: Coordinating Corporate Investment and Financing Policies. The Journal of Finance, 48(5), 1629. 33. Fleischmann, B., Ferber, S. and Henrich. P., “Strategic Planning of BMW’s Global Production Network“, Interfaces, 36(3), pp.194-208, 2006. 106 34. Geng, N. and Jiang, Z., “Capacity Planning for Semiconductor Wafer Fabrication with Uncertain Demand and Capacity”, Proceedings of the 3rd Annual IEEE Conference on Automation Science and Engineering, pp. 100-105, 2007. 35. Grunow, M., Gunther, H. O., Burdenik, H. and Alting, L., “Evolving Production Network Structures“, Annals of the CIRP, 56, pp.427-430, 2007. 36. Hood, S. J., Bermon, S. and Barahona, F., “Capacity Planning under Demand Uncertainty for Semiconductor Manufacturing”, IEEE Transactions on Semiconductor Manufacturing, 16(2), pp.173-280, 2003. 37. Hopp, W.J., and Spearman, M.L., “Factory Physics: Foundations of Manufacturing Management”, Second Edition, McGraw-Hill, 2000. 38. Hua, Z. S. and Huang, F., “A Hybrid Heuristic for PWB Capacity Expansion Problem”, Lecture Notes in Computer Science, 4113, pp.802-811, 2006. 39. Hung, Y. F. and Hu, Y. C., “Solving Mixed Integer Programming Production Planning Problems with Setups by Shadow Prices Information”, Computer and Operations Research, 25(12), pp.1027-1042, 1998. 40. Ho/ yland , K., Kaut, M. and Wallace, S. W., “A Heuristic for Moment-Matching Scenario Generation”, Computational Optimization and Applications, 24, 19-185, 2003. 41. Ho/ yland , K., Kaut, M. and Wallace, S. W., “Generating Scenario Trees for Multistage Decision Problems”, Management Science, vol.47, no.2, pp.295-307, 2001. 42. Julka, N., Baines, T., Tjahjono, B., Lendermann, P. and Vitanov V., “A Review of Multi-Factor Capacity Expansion Models for Manufacturing Plants: Searching for a Holistic Decision Aid”, International Journal of Production Economics, 106, pp.607-621, 2007. 43. Kaut, M., Wallace, S. W., Vladimirou, H., & Zenios, S. A. (2003). Stability analysis of a portfolio management model based on the conditional value-at-risk measure. Finance, 1-23. 44. Karabuk, S. and Wu, S. D., “Coordinating Strategic Capacity Planning in the Semiconductor Industry”, Operations Research, 51(6), pp.839-849, 2003. 45. Kuska, N. G., Romisch, W., Nowak, M. P., Wegner, I. and Kiwiel, K. C., “Power 107 Management under Uncertainty by Lagrangian Relaxation”, the 6th International Conference Probabilistic Method Applied to Power Systems, PMAPS, vol.2, INESC Porto, 2000. 46. Kouwengerg, R., “Scenario Generation and Stochastic Programming Models for Asset Liability Management”, European Journal of Operational Research, 134, 279-292, 2001. 47. Lee, S. B. and Luss, H., “Multifacility-Type Capacity Expansion Planning: Algorithms and Complexities”, Operations Research, 35(2), pp.249-253, 1987. 48. Levis, A. A. and Papageorgiou, L. G., “A Hierarchical Solution Approach for Multi-Site Capacity Planning under Uncertainty in the Pharmaceutical Industry”, Computer and Chemical Engineering, 28, pp.707-725, 2004. 49. Li S. and Triupati, D., “Dynamic Capacity Expansion Problem with Multiple Product: Technology Selection and Timing of Capacity Additions”, Operations Research, 42(5), pp.958-976, 1994. 50. Li, H., Hendry, L. and Teunter, R., “A Strategic Capacity Allocation Model for a Complex Supply Chain: Formulation and Solution Approach Comparison”, International Journal of Production Economics, to appear, 2007. 51. Liang, Y. Y. and Chou, Y. C., “Option-Based Capacity Planning for Semiconductor Manufacturing”, 2003 IEEE International Symposium on Semiconductor Manufacturing, pp.77-80, 2003. 52. Lin, J. T., Chen, T. L. and Lin, Y. T., “A Hierarchical Planning and Scheduling Framework for TFT-LCD Production Chain”, 2006 IEEE International Conference on Service Operations and Logistics, and Informatics, pp.711-716, 2006. 53. Lin, J. T. and Chen, T. L., “A Capacity Planning Model in the TFT-LCD Production Chain”, 2007 IEEE/INFORMS International Conference on Service Operations and Logistics, and Informatics, pp.460-465, 2007. 54. Lin, J. T., Chen, T. L. and Chen, W. J., “Capacity and Product Mix Planning Problem for TFT Array Multi-Plant”, Journal of the Chinese Institute of Industrial Engineers, 24(6), pp.489-504, 2007. 55. Lin, J. T., Wu, C. H., Chen, T. L. and Chang, Y. C., “A Stochastic Programming 108 Model for Strategic Capacity Planning in TFT-LCD Production Chain”, The 8th Asia Pacific Industrial Engineering & Management System and Conference, 2007. 56. Lin, J. T., Wu, C. H., Chen, T. L., and Shih, S. H., “A Stochastic Programming Model for Strategic Capacity Planning under Demand Uncertainty in TFT-LCD Production Chain”, Working paper, 2008. 57. Lim, S. K. and Kim Y. D., “An Integrated Approach to Dynamic Plant Location and Capacity Planning”, The Journal of the Operation Research Society, 50(12), pp.1205-1216, 1999. 58. Liu, M. L. and Sahinidis, N. V., “Bridging the Gap Between Heuristics and Optimization: Capacity Expansion Case”, AIChE Journal, 43(9), pp.2289-2299, 1997. 59. Lucas, C., MirHassani, S. A., Mitra, G. And Poojari, C. A., “An Application of Lagrangean Relaxation to a Capacity Planning Problem under Uncertainty”, Journal of the Operational Research Society, 52, pp.1256-1266, 2001. 60. Luss, H, “Operations Research and Capacity Expansion Problem: A Survey”, Operations Research, 30(5), pp.907-947, 1982. 61. Li, Z. and Ierapetritou, M., “Process Scheduling under Uncertainty: Review and Challenges”, Computers and Chemical Engineering, 32, 715-727, 2008. 62. Melo, M. T., Nickel, S. and Gama, F. S. “Dynamic Multi-commodity Capacitated Facility Location: A Mathematical Modeling Framework for Strategic Supply Chain Planning”, Computers & Operations Research, 33, pp.181-208, 2005. 63. Mieghem, J. A. V., “Capacity Management, Investment, and Hedging: Review and Recent Developments”, Manufacturing & Service Operations Management, 5 (4), pp.269-302, 2003. 64. MirHassani, S. A., Lucas, C., Mitra, G., Messina, E. and Poojari, C. A, “Computational Solution of Capacity Planning Models under Uncertainty”, Parallel Computing, 26(5), pp. 511-538, 2000. 65. Miller, A. C. and Rice, T. R., “Discrete Approximations of Probability Distributions”, Management Science, vol.29, no.3, pp.352-362, 1983. 66. Oh, H. C. and Karimi, I. A., “Regulatory Factors and Capacity-Expansion 109 Planning in Global Chemical Supply Chains”, Industrial & Engineering Chemistry Research, 43, pp.3364-3380, 2004. 67. Papageorgiou, L. G., Rotstenin, G. E. and Shah, N., “Strategic Supply Chain Optimization for the Pharmaceutical Industries”, Industrial & Engineering Chemistry Research, 40, pp.275-286, 2001. 68. Rockafellar, R. T., & Uryasev, S. (1999). Optimization of Conditional Value-at-Risk, 1-26.. 69. Rajagopalan, S., “Capacity Expansion and Equipment Replacement: A Unified Approach”, Operations Research, 46(6), pp.846-857, 1998. 70. Rajagopalan, S and Swaminathan, J. M., “A Coordinated Production Planning Model with Capacity Expansion and Inventory Management”, Management Science, 47(11), pp.1562-1580, 2001. 71. Ricerche, C. M. (2008). Hidden Markov models for scenario generation. IMA Journal of Management Mathematics 72. Ryu, J. H., “Multi-period Planning Strategies with Simultaneous Consideration of Demand Fluctuations and Capacity Expansion”, Industrial & Engineering Chemistry Research, 45, pp.6622-6625, 2006. 73. Romauch, M. and Hartl, R. F., “Dynamic Facility Location with Stochastic Demands”, SAGA 2005, LNCS 3777, pp.180-189, 2005. 74. Sahinidis, N. V. and Grossmann, I. E., “Reformulation of the Multiperiod MILP Model for Capacity Expansion of Chemical Process”, Operations Research, 40 (1), pp.S127-S144, 1992. 75. Santoso, T., Ahemd, S., Goetschalckx, M. and Shapiro, A., “A Stochastic Programming Approach for Supply Chain Network Design under Uncertainty”, European Journal of Operational Research, 167, pp.96-115, 2005. 76. Shapiro, A. and Philpott, A., “A Tutorial on Stochastic Programming”, working paper, 2007. 77. Syam, S. S. “Multiperiod Capacity Expansion in Globally Dispersed Regions”, Decision Science, 31(1), pp.173-195, 2000. 78. Swaminathan, J. M., “Tool Capacity Planning for Semiconductor Fabrication Facilities under Demand Uncertainty”, European Journal of Operation Research, 110 120, pp.545-558, 2000. 79. Swaninathan, J. M., “Tool Procurement Planning for Wafer Fabrication Facilities: A Scenario-Based Approach”, IIE Transactions, 34, pp.145-155, 2002. 80. Schutz, P., Tomasgard, A. and Ahmed S., “Supply Chain Design under Uncertainty Using Sample Average Approximation and Dual Decomposition”, European Journal of Operational Research, 199, p.409-419, 2009. 81. Sahinidis, N. V., “Optimization under Uncertainty: State-of-the-Art and Opportunities”, Computers and Chemical Engineering, 28, 971-983, 2004. 82. Smith, J. E., “Moment Methods for Decision Analysis”, Management Science, vol.39, no.3, pp.340-358, 1993 83. Wagner, J. M. and Berman, O., “Models for Planning Capacity Expansion of Convenience Stores under Uncertain Demand and the Value of Information”, Annals of Operations Research, 59, pp.19-44, 1995. 84. Wang, K. J. and Lin, S. H, “Capacity Expansion and Allocation for a Semiconductor Testing Facility under Constrained Budget”, Production Planning & Control, 13(5), pp.429-437, 2002. 85. Wang, K. J. and Hou T. C, “Modeling and Resolving the Joint Problem of Capacity Expansion and Allocation with Multiple Resources and a Limited Budget in the Semiconductor Testing Industry”, International Journal of Production Research, 41 (14), pp.3217-3235, 2003. 86. Wang, S. M., Chen, J. C and Wang, K. J., “Resource Portfolio Planning of Make-To-Stock Products Using a Constraint Programming–Based Genetic Algorithm”, Omega, 35, pp.237-246, 2007. 87. Wang, K. J., Wang, S. M. And Yang, S. J., “A Resource Portfolio Model for Equipment Investment and Allocation of Semiconductor Testing Industry“, European Journal of Operational Research, 179, pp.390-403, 2007. 88. Wang, K. J., Wang, S. M. and Chen, J. C., “A Resource Portfolio Planning Model Using Sampling-Based Stochastic Programming and Genetic Algorithm”, European Journal of Operational Research, 184, pp.327-340, 2008. 89. Wu, S. D., Erkoc, M. and Kararbuk, S., “Managing Capacity in the High-tech Industry: A Review Literature“, The Engineering Economist, 50, pp.125-158, 111 2005. 90. Wu, M. C., Hsiung, Y. and Hsu, H. M., “A Tool Planning Approach Considering Cycle Time Constraints and Demand Uncertainty”, International Journal of Advanced Manufacturing Technology, 26, pp.565-571, 2005. 91. Wagner, J.M. and Berman, O., “Models for Planning Capacity Expansion of Convenience Stores under Uncertain Demand and the Value of Information”, Operations Research, 59, pp.19-44, 1995 92. Yilmaz, P. and Catay, B., “Strategic Level Three-stage Production Distribution Planning with Capacity Expansion”, Computer & Industrial Engineering, 51, pp.609-620, 2006. 93. Zenios, S. A., “Practical Financial Optimization: Decision Making for Financial Engineers”, 2005.
|