透過您的圖書館登入
IP:18.117.153.38
  • 期刊

專案監造人力指派最佳化模式之研究

An Optimization Model for Manpower Assignment to Construction Inspection Projects

摘要


對工程顧問公司而言,如何不浪費人力資源,且適時、適量指派人力以符合監造合約之需求,實為當下決策者所面對的一大課題。本研究針對中、大型監造專案之人力工作指派問題,以最小成本為目標,考量各監造合約需求之相關限制,利用數學規劃技巧,發展一最佳化混合整數規劃模式,以供決策者有效地運用人力資源。為展示模式之應用並初步測試模式之績效,本研究以一獨立監造專案為例,進行範例測試,結果顯示本研究模式應可為學術界與實務界之參考。

並列摘要


For engineering consulting companies, it is a major issue for decision makers to effectively use their available manpower resource to accomplish given jobs in a specified time period. In this research we employ mathematic programming techniques to develop a mixed integer programming model, given available engineer resource, project/job demand and related constraints, to optimally solve medium or large manpower assignment problems, in order to help the decision maker effectively assign projects/jobs to engineers. To demonstrate the model application and to preliminarily test the model in practice, we perform a case study using real operating data from an engineering consulting company. The results show that the model could be useful reference in practice.

被引用紀錄


周奕漳(2014)。專案管理與系統思考在施工計畫問題解決之應用-以河川環境營造工程管理為例〔碩士論文,國立交通大學〕。華藝線上圖書館。https://doi.org/10.6842/NCTU.2014.00329
張世昇(2011)。工程標案承攬策略最佳化之探討〔碩士論文,國立中央大學〕。華藝線上圖書館。https://www.airitilibrary.com/Article/Detail?DocID=U0031-1903201314412919
張人文(2012)。建設公司區域開發銷售規劃最佳化研究〔碩士論文,國立中央大學〕。華藝線上圖書館。https://www.airitilibrary.com/Article/Detail?DocID=U0031-1903201314444205
劉尚和(2012)。橋樑柱墩維修工程人機作業最佳化模式之研究〔碩士論文,國立中央大學〕。華藝線上圖書館。https://www.airitilibrary.com/Article/Detail?DocID=U0031-1903201314444876
張德祥(2012)。電視節目製作成本人力指派最佳化決策模式研究〔碩士論文,國立中央大學〕。華藝線上圖書館。https://www.airitilibrary.com/Article/Detail?DocID=U0031-1903201314444436

延伸閱讀