Evaluation of parameters is of great importance in the retaining and bracing system analyses of deep excavation. The sensitivity of the design parameters should be carefully handled and the improper construction behavior should be avoided to have the situation in control beforehand, although the safety of the bracing system is directly related to the quality of construction management and must rely upon monitoring system to thoroughly comprehend the excavation behavior.This study is based on data from soil laboratory testing, construction arrangement and monitoring results in a site of Taipei basin. All the design parameters used in the analysis are examined one by one for the sensitivity study of the stress and strain in the retaining and bracing system.