透過您的圖書館登入
IP:18.117.153.38
  • 期刊

蘇澳港觀光暨轉運專區對貨物裝卸之影響研究

An Impact Study of the Su-Ao Port's Tourist and Transit Area on Cargo Handling

摘要


臺灣港務公司為充裕營收、活化資產及配合地方發展,規劃將蘇澳港第三港渠開發為轉運專區與複合式多樣貌商城。由於轉運專區成立後,實際提供散裝貨物裝卸碼頭數量將減少,整體碼頭使用率必然提高,故而本文冀望透過蘇澳港過去5年貨物裝卸與船舶靠泊碼頭時數資料,並參酌臺灣世曦公司於規劃案中對蘇澳港2021年的散雜貨運量預測600.78萬公噸,據以分析與推估碼頭使用率與各項碼頭靠泊時數,研擬因應對策供決策參考。研究顯示:2021年推估第三港渠碼頭靠泊時數為13,646小時;其中,非汙染與汙染貨物各為8,588與5,058小時。依此,文中建議可行的調整方式,調整後碼頭使用率仍可達理想值,亦提出應修訂蘇澳港的船舶繫泊作業須知的條文以配合船席調派與重新規劃碼頭使用。

並列摘要


For increasing sufficient revenues, reactivating assets, as well as catering to the needs of the local community, Taiwan International Ports Corporation, Ltd. (TIPC) is planning to build the third harbor of Su-Ao Port as a cargo transport and transit area and a complex and diversified shopping mall. The wharves for bulk cargo handling will reduce with the construction of this tourism and transit area, and the berth occupancy rate will also rise inevitably. Judging from the past 5 years’ data of bulk cargo handling and ship berthing hours in Su-Ao Port and the forecast of the berth occupancy rate with the bulk cargo handling of 6,007,800 tons in 2021 (from the planning report of CECI), this paper aims to analyze and predict berth occupancy rate and ship berthing hours in order to offer strategies and solutions for governments’ reference. The final results show that the ship berthing hours of the third harbor of Su-Ao Port will be estimated 13,646 hours in 2021 and the non-contaminated goods and contaminated goods will be 8,588 hours and 5,058 hours respectively. According to these estimates, we propose a feasible and adjustable alternative in which the berth occupancy rate will reach its ideal values. Meanwhile, we suggest revising operation directions for the ship berthing wharf of Su-Ao Port in accordance with the berthing coordination and the re-planning of the use of the wharf.

參考文獻


Bugaric, U. S.,Petrovic, D. B.,Jeli, Z. V.,Petrovic, D. V.(2012).Optimal Utilization of the Terminal for Bulk Cargo Unloading.Simulation.88(12),1508-1521.
Eniola, J. O.,Njoku, I.,Oluwatosin, A. F.,Okoko, E.(2014).Performance Evaluation of Nigerian Ports: Pre and Post Concession Eras.Civil and Environmental Research.6(2),1-13.
Fourgeaud, P.(2000).Measuring Port Performance.,::The World Bank.
Jayaprakash, P. O.,Gunasekaran, K.(2012).Measurement of Port Performance Utilising Service Time of Vessels.International Journal of Civil Engineering and Building Materials.2(2),55-63.
Layaa, J.,Dullaert, W.(2014).Measuring and Analysing Terminal Capacity in East Africa: The Case of the Seaport of Dar es Salaam.Maritime Economics and Logistics.16(2),141-164.

延伸閱讀