透過您的圖書館登入
IP:18.119.125.7
  • 期刊

半導體製造之先進製程産能就緒時點的經濟模式

An Economic Model of Capacity Deployment Timing for Advanced Processes of Semiconductor Manufacturing

若您是本文的作者,可授權文章由華藝線上圖書館中協助推廣。

摘要


高科技産業的技術研發與産品需求有很高的不確定性,而先進製程産能的投資成本往往很高、製程技術更迭迅速、建廠的前置時間長,産能建置過早會造成設備閒置,建置太晚則會喪失商機,所以産能建置的就緒時點是高科技製造企業的重要決策。本文的主要目的是探討半導體先進製程産能的建置規劃方法,本文首先建構包含良率改善的隨機模型在內的系統動態模型,其次,依據系統動態關係,建立一個考慮設備閒置與商機損失的經濟分析模式,最後,經由優化運算求算建置産能的最佳時點。未來的高科技産業仍將會有很多的不確定性,本文提出的産能規劃理論與方法將有助於分析風險與制訂對策。

並列摘要


Technology development and product demand in high-tech industries are full of uncertainties. Since building a factory requires long lead-time and manufacturing capacity incurs high cost, capacity deployment timing is an important decision in the uncertain environment of technology development and volatile demand. The objective of this paper is to propose a decision method for capacity deployment timing for advanced process technology of semiconductor manufacturing. A dynamic system model based on a stochastic model of yield improvement is first presented. An economic analysis model that trades off over-capacity and under-capacity costs is then derived. Finally, a numerical example is given to show how to optimize capacity deployment timing by using this model.

參考文獻


Abmed, Shabbir(2002).Semiconductor Tool Planning via Multi-stage Stochastic Programming.Proc. of 2002 Int. Conference on Modeling and Analysis of Semiconductor Manufacturing.(Proc. of 2002 Int. Conference on Modeling and Analysis of Semiconductor Manufacturing).:
Balasubramamam, S.,Sarwar, A. K.,Walker, D. M. H.(1997).Yield Learning in Integrated Circuit Package Assembly.IEEE Transactions on components, packaging, and manufacturing technology, part C.20(2),133-141.
Baldi, L.(1996).Industry Roadmaps: The Challenge of Complexity.Microelectronic Engineering.34,9-12.
Barahona, Francisco,,Bennon, S.,Gunluk, O.,Hood, S.(2001).Research Report RC22196.IBM.
Benavides, D. L.,Duley, J. R.,Johnson, B. E.(1999).As Good as it Gets: Optimal Fab Design and Development.IEEE Transactions on Semiconductor Manufacturing.12(3),281-287.

被引用紀錄


李葆慧(2015)。影響高科技產業產品研發績效之關鍵因素-FAHP應用之研究〔碩士論文,中原大學〕。華藝線上圖書館。https://doi.org/10.6840/cycu201500239
黃馨儀(2010)。運用預留產能以緩解供應鏈需求風險之探討〔博士論文,國立臺灣大學〕。華藝線上圖書館。https://doi.org/10.6342/NTU.2010.00551

延伸閱讀