透過您的圖書館登入
IP:18.116.51.117
  • 學位論文

驗收缺失之研究-以高科技廠房潔淨室工程為例

Study of Quality Improvement For Final Acceptance - A High-tech Clean Room Engineering

指導教授 : 張陸滿

摘要


工程從規劃、設計、發包及施工完成,乃至營運管理,係於有限資源下完成,該完成物具備唯一及獨特性,不易複製,建設期間能否如質、如期及如預算完成,完成後又能否依規劃當初所確認的需求發揮功效,確需專家共同努力,始得完成。一個高科技廠房新建工程,從無到有,從荒地到產品的產出,以一個12吋晶圓廠從規劃設計、發包、興建、驗收到運轉合理的時間約需二年,根據在台灣已有多年且足夠的經驗,可將建廠時程縮短為12個月,無非是採用「同步建造」將設計、發包與興建同時執行,來加速完成廠房的興建。高科技廠房潔淨室工程,面對廠房建廠時程的壓縮、快捷要徑施工法等策略,邊施工邊設計、邊修改邊施工,忽略了設計與施工的程序,所引起的排程不合理、設計不周詳、試車調整沒落實等種種維持工程品質的困難,導致工程品質的不堪,往往是驗收缺失無法收拾。本研究即是針對驗收缺失之研究,目的是探討驗收缺失之型態及原因,並進一步探求預防之措施。

並列摘要


Projectfrom planning, design, contracting and construction is completed, as well as operational management, completed in the limited resources, the completion of the master with the sole and unique and difficult to copy. During the construction of whether such as quality, schedule and budget is completed and whether the original in accordiance with the plan confirmed by the demand to be effective, where the efforts of experts before they may complete. A high-tech plant new construction, from wasteland to the output of the product, a 12-inch wafer fabs from the planning and design, contracting, construction, acceptance to the operation of a reasonable period of time will take about two years. For many years and have enough experience in Taiwan construction time shortened to 12 months, is that synchronous construction will design, bidding and construction of the simultaneous execution, to accelerate the completion of plant construction. High-tech clean room engineering, the face of the compression of time, to be the critical path construction method and strategy, while construction design side to modify the construction, ignored the design and construction process, caused by the unreasonable schedule not well thought out design, test adjustment did not implement the various difficulties in the maintenance of project quality due to scheduling unreasonable, not well thought out design, not implementation of the test to adjust etc, various difficulties in the maintenance of project quality, the engineering quality of the state is often the acceptance of missing can not clean up. The study is for the defect of acceptance, the purpose is to study the types and causes of the acceptance of defect, and futher study prevention measures.

參考文獻


11. 「品質計畫製作綱要」,公共工程委員會,2004 年 09 月 修正。
1. 張陸滿,「談高科技廠房之營建管理」,中華技術期刊No.87,第10頁,財團法人中華顧問工程司,2010年7月。
2. 陳鴻雄,「建築物機水電工程施工-常見缺失之探討」,中工高雄會刊,第19卷,第2期,第64頁,2011年12月。
3. 游源順,「工程常見缺失的探討」,中工高雄會刊,第19卷,第2期,第83頁,2011年12月。
4. 許盛隆,「工程管理與工程法規」,第227頁,國家圖書館出版,2010年6月。

被引用紀錄


黃懷祖(2015)。預售屋公共設施之機電工程驗收缺失分析〔碩士論文,國立臺灣大學〕。華藝線上圖書館。https://doi.org/10.6342/NTU.2015.01712

延伸閱讀