There are two production systems currently used in the industry. One is the push system and the other is the pull system. Both of them have their own advantages and disadvantages. The most important thing is to utilize them in the right way. The military overhaul center is just a job shop, so the push system can work very well. However, the tremendous wastage of the resources is found during production since the department of production management can’t control the whole resources quite well. The concept of the Kanban is used in this research to utilize the local pull dispatching in the current push system. The experimental goals are to improve the nonaverage gradually and avoid wasting the resources. The experimental results show that the excellent improvement of the production average and the efficiency for the bottleneck station can be achieved. However, the limited improvement can only be obtained for the non-bottleneck station.