透過您的圖書館登入
IP:3.142.197.198
  • 學位論文

不完美生產系統下,考量不良品重工及原物料補貨之經濟批量排程問題

On an Economic Lot Scheduling Problem under an Imperfect Production Process with Reworks and Raw Materia

指導教授 : 宮大川

摘要


本研究以上下游製程中,不完美生產系統下的「經濟批量排程問題」為基本架構,同時考量原物料補貨、製程內檢驗、不完美重工製程、丟棄以及短缺。由於生產設備的老化可能使生產製程退化,導致製程偏移至失控狀態,並產生出不良品,因此本研究假設每一個產品被生產出來後,會立刻由檢驗製程檢查並將良品或不良品分類。所有產品被檢驗後,所有不良品會經由重工製程進行重工。然而,重工製程並非完美,無法將所有不良品重工成為良品,還是有部分產品必須被丟棄,且因此造成下游製程的需求短缺。根據上述不完美生產系統下的經濟批量排程問題,利用共同週期法建立數學模式。其目標是決定一組近似最佳解以最小化每單位時間總成本。近似最佳解包涵共同週期以及每種原物料補貨的間隔週期(每次補貨量可供給多少週期的用量)。本研究根據三種方法提出三種演算法進行求解,包括二分法、封閉形式解以及粒子群演算法,並利用數值範例驗證所提出的模式。最後進行敏感度分析並探討分析的結果。本研究試圖為同時考量不良品重工以及原物料補貨之不完美製程中的經濟批量排程問題,提供管理者指引以評估適當的生產週期以及原物料的採購量。

並列摘要


This research focuses on solving the Economic Lot Scheduling Problem (ELSP) under an imperfect production process that includes joint material replenishment, in-production screening process, imperfect rework process, scraps and shortage. The aging of a production facility may deteriorate the production process and the facility may shift to an out-of-control state wherein nonconforming items are produced. All defective items, which are defected by the screening process, may be reworked immediately after the production process finishes. However, since the rework process is imperfect, scraps are produced during the rework processes. The ELSP, in a deteriorating production system, is formulated by the Common Cycle (CC) approach. The objective is to determine near-optimal solutions, which include a common production cycle time and replenishment cycles of raw materials, for minimizing the expected total cost per unit time. Three problem solving procedures are developed to find near-optimal solutions for the proposed model. To demonstrate the model, the study provides a numerical example that illustrates the derivation of the solutions. Sensitivity analysis is also performed and discussed. The results show that the proposed deterministic model can provide managers with guidelines for evaluating the proper production cycle time and the purchase quantity of raw materials under a joint material replenishment policy.

參考文獻


Agnihothri, S.R. and Kenett, R.S., 1995. The impact of defects on a process with rework. European Journal of Operational Research, 80 (2), 308-327.
Arkin, E., Joneja, D. and Roundy, R., 1989. Computational complexity of un-capacitated multi-echelon production planning problems. Operations Research Letters, 8 (2), 61-66.
Ben-Daya, M. and Hariga, M., 2000. Economic lot scheduling problem with imperfect production processes. Journal of Operational Research Society, 51 (7), 875-881.
Ben-Daya, M. and Rahim, A., 1999. Multi-stage lot sizing models with imperfect processes and inspection errors. Production Planning & Control, 10 (2), 118-126.
Ben-Daya, M., Noman, S.M. and Hariga, M., 2006. Integrated inventory control and inspection policies with deterministic demand. Computers & Operations Research, 33 (6), 1625-1638.

被引用紀錄


莊宗樺(2017)。產險旅行平安保險購買之研究-以大台北地區為例〔碩士論文,淡江大學〕。華藝線上圖書館。https://doi.org/10.6846/TKU.2017.00032
陳俊宇(2008)。特殊主題旅遊顧客價值拓展模式之研究- 以安藤忠雄之旅為例〔碩士論文,國立高雄餐旅大學〕。華藝線上圖書館。https://doi.org/10.6825/NKUHT.2008.00018
鄭雅芬(2013)。大陸遊客對參訪臺灣休閒農場的行為意圖模式之研究〔碩士論文,國立屏東科技大學〕。華藝線上圖書館。https://doi.org/10.6346/NPUST.2013.00182
張雅媜(2010)。宗教觀光旅遊動機、目的地吸引力與滿意度之研究─以南鯤鯓代天府為例〔碩士論文,朝陽科技大學〕。華藝線上圖書館。https://www.airitilibrary.com/Article/Detail?DocID=U0078-0601201112113974
許雅婷(2011)。獨自旅行者之生活型態、旅遊動機與心理幸福感關係之研究〔碩士論文,國立高雄餐旅大學〕。華藝線上圖書館。https://www.airitilibrary.com/Article/Detail?DocID=U0018-2007201112155200

延伸閱讀