治水與生態共構之公園:以石門水庫後池左岸為例

A Water Control and Ecology Jointly Constructed Park:A Case Study on Left Bank of the Shimen Reservoir Rear Pool

指導教授 : 堀込憲二

摘要


石門水庫後池護岸每遇風災便被破壞,為此政府動輒投入上億元修復公帑,以確保護岸功能,為將經費發揮其應有的建設上,探討其治本之研究及結合地方特色及居民需求,為此主因,並作為主管機關推動治理之建議。 而本文探討後池左側護岸遭受颱風災害損壞原因,參考國內外相似功能之近自然生態工法,研擬護岸之永續建築對策。將原後池之混凝土構築護岸及其十三公頃腹地融合當地景觀,以人工輔成自然,自然完成人工的理念孕育出自然環境景觀。強化後池護岸的更生機能結合生態工法共構為治水與親水的公園。 護岸順應自然沖蝕,以順水代替治水作永久治本性之建設:以管理當局委託專業單位整理之水文分析資料,預估護岸最大衝擊所在區段,依時間作階段性之時程規劃作合理之腹地退縮以順水模式治理,並配合局部基礎工程構築,達到鞏固池岸邊坡。後池左岸腹地所在區域,規劃為治水公園,調節供水及觀光:為利用綠地護坡引流洪水,對本區域規劃三大對策為低水(溼地)、親水(調整池)、保全草坪(腹地草坪)地域等,並導入附近農村環境及青山綠景,目標成為地方特色及展現場所精神的表徵。

並列摘要


Shihmen reservoir revetment pool will be destroyed whenever the storm, for which the Government invested a billion dollars prone repair of public funds, to ensure that the revetment features, for the funds to play its proper construction, to explore the root of the problem of research and combining local characteristics and the residents demand, the main reason for this, and as the competent authority to promote management's proposal. This article explores the left side of the pool after the typhoon disaster damaged revetment reasons, similar to features of the reference at home and abroad in recent ecological engineering methods, to develop the sustainable building measures revetment. After the original pool of 13 hectares of concrete to build a revetment and its hinterland integration of the local landscape, the artificial auxiliary into a natural, natural completion of the natural environment has nurtured the concept of artificial landscapes. Strengthened with pool revetment rehabilitation function of ecological engineering methods for water control structure and hydrophilic park. Revetment adapt to natural erosion to downstream flood control instead of a permanent cure of the building: to manage the professional unit was commissioned to collate the hydrological analysis of information, estimate the impact of revetment where the largest segment, depending on when the time for phased-term planning to make a reasonable The hinterland retreat in downstream mode of governance, and in line with local foundation engineering construction, to the consolidation of pond shore slope. Pool on the left bank after the hinterland region, planning to flood control, parks, regulating water supply and tourism: for the use of green slope drainage floods, three major strategies of the regional planning for low-water (wetlands), hydrophilic (adjusted pool), the preservation of the lawn (the hinterland of the lawn ) geographic, etc., and into the rural environment and Castle Peak near Greenview goal as local features and demonstrate the spirit of the characterization of sites.

參考文獻


石門水庫增設第二後池工程計畫-後池安全影響分析報告,主辦機關:經濟部水利署北區水資源局,執行單位:黎明工程顧問股份有限公司2006年11月
石門水庫第三次整體安全檢查與評估,主辦機關:經濟部水利署北區水資源局,執行單位:中興工程顧問股份有限公司2006年7月
石門水庫第二次整體安全檢查與評估,主辦機關:經濟部水利署北區水資源局,執行單位:中興工程顧問股份有限公司1998年12月
石門水庫後池整體修復規劃報告,主辦機關:經濟部水利署北區水資源局,執行單位:中興工程顧問股份有限公司2001年9月
石門水庫後池改善初步規劃,主辦機關:經濟部水利署北區水資源局,執行單位:中興工程顧問股份有限公司2008年12月

延伸閱讀