本研究之主要目的乃在專案工期固定之情況下,考慮不可儲存性之資源可使用成本與可儲存資源之相關物料成本下,提出使總專案淨收益及排程穩定度雙目標函數最大化之混合整數非線性規劃模式以及粒子群優法。為驗證本研究所提出的排程法則之績效,本研究也選取現行研究中三個績效優越的啟發式排程法與四種訂購批量法,結合成十二種二階段批量法來進行實驗設計與績效評估分析。研究結果顯示,本研究所提出之粒子群優法的排程績效相當接近最佳解。同時在總專案淨收益與排程穩健度之排程目標下也遠優於其他二階段批量法。本研究所提出的法則可供決策者作為多專案排程問題規劃之重要參考。
The main purpose of this study is to explore a bi-objective resource-constrained project scheduling problem with robustness and resource availability cost criteria. We propose a mixed integer nonlinear programming (MINLP) model and a particle swarm optimization (PSO) algorithm to solve the problem. The performance of the proposed PSO algorithm is manifested by comparing it with the MINLP model and the existing rules. The results indicate that the solution obtained by the PSO algorithm is very close to the optimal solution. Moreover, the results indicate that the PSO algorithm is superior to the existing heuristic rules under the performance criteria of the project resource availability cost and the schedule robustness. The approaches proposed in this study can provided project managers with useful tools for making better decisions.