Application of the engineering economy to evaluating the rent in the low interest rate is an excellent technique. This technique may be adopted to obtain the maximum profit from the rental market by determined in supply and demand curve. In this paper, different cash flows are calculated in various plans by shift equivalence. An AW method in engineering economic may be easily conducted to compare the difference between normal (12%) and low (5%) interest rate. For a house owner, instance, he who can establish an incentive bottom line cost based on mutual benefit by this methodology.
為了持續優化網站功能與使用者體驗,本網站將Cookies分析技術用於網站營運、分析和個人化服務之目的。
若您繼續瀏覽本網站,即表示您同意本網站使用Cookies。