以WebGIS與MIS整合建置用地取得暨工程生命週期整合應用系統

Build Land Acquisition and Construction Lifecycle Integration and Application System by integrating WebGIS and MIS

摘要


政府興辦各項重大公共建設或實施國家重要政策,不僅可以促進經濟發展,更可持續提高國民生活水準,其中,水利工程乃水利署發展國家重大建設與民眾安全的根基之一,各項水利工程建設要能順利施作,從工程勘查、用地取得至工程施工完成,每一執行階段過程之進度與執行內容,都是非常重要的資料,為能有效記錄與保存水利工程建設執行生命週期各階段歷程資料與提供空間分布資訊,即需運用系統相關技術進行E化管理並進行相關資訊整合應用,以達到水利署水利工程用地智慧化管理之目標。水利署水利工程用地取得與建設業務,其執行人員遍及全臺所屬機關,為推廣與宣導該業務執行流程與注意事項,透過建立水利工程用地取得標準作業流程及相關規範(Standard Operating Procedure, SOP)以利業務人員遵循,另為能有效及時掌握工程用地取得整體業務執行進度與成果的落實,導入業務資訊化管理(Management Information System, MIS)及空間化管理(Geographic Information System, GIS)技術,透過建置「用地取得暨工程生命週期整合應用系統」,以推動水利署工程用地取得業務流程E化管理並得以將歷年重要資訊保存,且透過空間化資訊輔助,大幅降低過去填報及資訊蒐集之時間與人力成本,並提昇用地取得作業管控與管理之效能。

並列摘要


The government established various major infrastructure or implement important national policies. It can not only promote economic development, but also sustainably improve people's standard of living. Besides, water resources engineering is one of the foundations for the development of major national construction and civil aid to the Water Resources Agency. Various water resources engineering must be able to be implemented smoothly. From project investigation, land acquisition to completion of engineering construction, the data of the progress and execution content of each performing stage is very important. To effectively record and preserve the life cycle of implementation of water resources engineering and historical data of each stage, and provide the information of spatial distribution. It needs to use the system-related technologies for e-management and integrate relevant information to achieve the goal of intelligent management for water resources engineering of Water Resources Agency. Water resources engineering land acquisition and construction business of Water Resources Agency, and its executors are all over Taiwan's subordinate agencies. In order to promote and publicize the business implementation process and precautions. Through the establishment of SOP (standard operating procedures) of water resources engineering land acquisition to let the sales executive follow. Besides, to effectively and promptly grasp the land acquisition to obtain the overall business implementation progress and the implementation of the results, we import the technology of MIS (Management Information System) and GIS (Geographic Information System). Through the establishment of "Land Acquisition and Construction Lifecycle Integration and Application System", we promote the e-management of the business process of the land acquisition of Water Resources Agency, and save important information over the years. In addition, through the assistance of spatial information, it greatly reduces the time and labor costs of filing and information collection before, and improve the effectiveness for control and management of land acquisition.

參考文獻


內政部國土測繪中心,2021。內政部國土測繪中心國土測繪圖資服務雲,https://maps.nlsc.gov.tw/。
內政部資訊中心,2021。內政部資訊中心 TGOS 地理資訊圖資雲服務平台,https://www.tgos.tw/tgos/web/tgos_home.aspx。
洪榮宏,2005。開放式空間資訊整合、服務及應用架構研究,行政院國家科學委員會專題研究計畫。
地政司, 2021 。政府資料開放平臺-公有土地資料(土地屬性資訊),https://data.gov.tw/dataset/34315。
國家發展委員會,2022。數位國情架構精進調查與政府數位成熟度評估,https://www.teg.org.tw/research/study_detail.php?gid=2307&ggid=2464。

延伸閱讀