China's national economic construction enters a new period of rapid development after the "14th five-year" development strategic planning, as the main industry of economic development support, construction and mechanical and electrical industries continue to rise. With the expansion of infrastructure scale and the improvement of infrastructure product types in first-tier frontier cities, the investment, design and construction of super high-rise buildings are increasing and increasing. With the increasing complexity of the structure form of super high-rise buildings, people have higher and higher requirements on the use function, indoor comfort and appearance of buildings, and the corresponding mechanical and electrical design of super high-rise buildings has also increased significantly in the level of complexity in technical aspects. In particular, building electrical system has an important impact on the operation and management of construction projects. Under the situation that the current construction projects increasingly show the characteristics of scale and complexity, the demand for electrical system management is relatively higher. Building Information Modeling (hereinafter referred to as "BIM") technology has several characteristics, such as visibility, collaboration, simulation, parameterization and graphability. BIM technology is applied in the electrical construction and management of super high-rise buildings. It can save the cost, improve the construction efficiency, shorten the construction period, and has a good application prospect. Combined with the actual construction cases, this topic analyzes the specific application of BIM technology from the aspects of model building, in-depth design, pipeline collision inspection, construction simulation, roaming inspection, visualization three-dimensional reveal, etc., and focuses on optimizing the construction of the room and other pipeline dense places, and analyzes the optimization effect of BIM technology. Based on the actual construction of the super high-rise project of our enterprise, this paper studies the mechanical and electrical design of the project and the key points of the electrical application of BIM technology in a super high-rise project, and explores the combination of technology application and improving the project management level, so as to achieve better production and operation benefits.