【3】 Kartam S. (1999)“Generic Methodology for Analyzing Delay Claims“,Journalof Construction Engineering and Management, ASCE,Vol. 125,No.6, pp.409-419.
【4】 Yates J. K. and Epstein A. (2006)“Avoiding and Minimizing Construction Delay Claim Disputes in Relational Contracting“,Journal of Professional Issues in Engineering Education and Practice,ASCE,Vol. 132,No.2.
向明恩(2021)。Analysis of Claim for Substitute Benefits。臺北大學法學論叢,(120),51-144。https://www.airitilibrary.com/Article/Detail?DocID=16815939-202112-202201100012-202201100012-51-144