DOI
stands for Digital Object Identifier
(
D
igital
O
bject
I
dentifier
)
,
and is the unique identifier for objects on the internet. It can be used to create persistent link and to cite articles.
Using DOI as a persistent link
To create a persistent link
「
https://doi.org/
」
before a DOI.
For instance, if the DOI of an article is
10.5297/ser.1201.002
, you can link persistently to the article by entering the following link in your browser:
https://doi.org/
10.5297/ser.1201.002
。
The DOI link will always direct you to the most updated article page no matter how the publisher changes the document's position, avoiding errors when engaging in important research.
Cite a document with DOI
When citing a document with a DOI, the DOI permanent URL should always be presented (if using APA or Chicago format, present https://doi.org/DOI number). If using a citation format that does not specify DOI, the DOI permanent URL should still be presented as a priority.
DOIs allow accurate citations, improve academic contents connections, and allow users to gain better experience across different platforms. Currently, there are more than 70 million DOIs registered for academic contents. If you want to understand more about DOI, please visit airiti DOI Registration ( doi.airiti.com ) 。
以空間語法結合DEA-DA為基礎分析建築工程施工作業要徑空間與衝突解析之研究
吳立文 , Ph.D Advisor:郭斯傑
繁體中文
DOI:
10.6342/NTU.2014.01880
要徑空間 ; 空間語法 ; DEA-DA ; TOPSIS ; 單元阻塞率 ; 流量法 ; Critical Space ; Space Syntax ; DEA-DA ; TOPSIS ; Unit Blocking Rate ; Direction Flow


- [3]Akinci, B., M. Fischer, J. Kunz, and R. Levitt. 2000. Formalization and Automation of Time-Space Conflict Analysis. CIFE working paper 58, Stanford University.
連結: - [4]Barnett, J.H. 2005. Early Writings on Graph Theory: Euler Circuits and the Königsberg Bridge Problem. Colorado State University.
連結: - [5]Charnes, A., W. Cooper, and E. Rhodes. 1978. Measuring the Efficiency of Decision Making Units. European Journal of Operational Research, 2(6): 429-444.
連結: - [6]Cheng, M.Y., and J.T. O’Connor. 1996. ArcSite: Enhanced GIS for Construction Site Layout. J .Constr .Eng. Manage. 122(4): 329-336.
連結: - [8]Hegazy, T. 1999. Optimization of Resource Allocation and Leveling Using Genetic Algorithms. Journal of Construction Engineering and Management. 125(3): 167-175.
連結: