多廠區跨廠產能規劃之探討

Multi-Plant Capacity Planning for Coordinated Manufacturing

指導教授 : 鄭元杰
若您是本文的作者,可授權文章由華藝線上圖書館中協助推廣。

摘要


近年來企業為承接更大量的訂單,不斷的擴充產能,從企業成立之初單廠區模式,不斷的擴廠與合併,使得企業規模日漸增大,製造工廠也從一廠的模式擴充至多廠,為因應此生產環境的改變,以往單廠之生產規劃已不敷使用。所以,如何在現階段生產環境下,規劃多廠間跨廠產能規劃就顯得相當重要。 本研究針對多廠生產規劃問題,在廠與廠間歷史銷售量及既有的資源設備下,建立三階段規劃模式以生產總成本最小為目標。業務依據歷史銷售量統一接單,根據銷售量產能限制分配訂單,再以機器產能限制規劃工作站產能負荷,找出瓶頸工作站利用跨廠生產方式解決多廠區產能規劃問題。其中三階段模式並考量生產成本、製造成本、外包成本、延遲成本與運送成本等之總成本最小下,取得第一階段各廠區訂單產品需求量;第二階段各廠工作站產能負荷及瓶頸工作站;第三階段平衡瓶頸工作站需求量,取得工作站跨廠生產量、外包量與產能利用率。如此,可以依據最佳跨廠產能規劃結果安排生產細部規劃與排程規劃。

並列摘要


In order to satisfy the demand of increasing orders, a company must expand the production capacity to meet the orders. Due to the increasing production scale, a company must adopt a multi-plant manufacturing strategy to increase the capacity to satisfy the ordered demands. Under this consideration, it is important to develop a coordinated capacity planning in the manufacturing model to meet the change in such production environment. The objective of this research is to develop three integrate capacity planning models in three phases. This model is aimed at minimizing the total production cost under the consideration of historical sales volumes among plants and constraints of resources and equipment. The multi-plant capacity planning model is analyzed according to the historical sales volume, order allocation by sales capacity constrain, workstation capacity load by machine capacity constrain to find the bottleneck workstation. In this model, we obtain the minimal integrated cost including production cost, manufacturing cost, out-sourcing cost, delay cost, and delivery cost. In phase one, we can obtain the amount of product order requirement of each plant. In phase two the workstation capacity load and bottleneck workstation of each plant is obtained. In phase three, we can obtain the workstation production amount, outsourcing amount and utilization of capacity by means of balancing the bottleneck workstation requirements. The multi-plant capacity is modeled and solved using the linear programming formulation and technologies. In this way, an optimal multi-plant capacity planning solution can be found. We can arrange the production planning and schedule planning according to the optimal solution of multi-plant capacity planning.

參考文獻


12. 葉鳳玲,「IC封裝產業的中期產能規劃問題探討」,私立元智大學,碩士論文,桃園中壢,民國88年。
10. 曾煥雯,「跨廠訂單分配模式之建構—應用模擬退火演算法」,私立元智大學,碩士論文,桃園中壢,民國89年。
3. 何晉凱,「多層印刷電路板廠之整合產能規劃」,私立元智大學,碩士論文,桃園中壢,民國90年。
15. Bryrne, M.D. and Bakir, M. A., “production planning using a hybrid simulation analytical approach,” International Journal of Production Economics, Vol.59, pp.305-311, 1999.
16. Bretthauer, K. M. and Murray, J. C., “Nonlinear programming for multiperiod capacity planning in a manufacturing system,” European Journal of Operational Research, Vol. 96, pp. 167-179, 1996.

被引用紀錄


劉謹銘(2009)。以基因演算法求解雙流線型工廠排程〔碩士論文,國立交通大學〕。華藝線上圖書館。https://doi.org/10.6842/NCTU.2009.00231
陳文旻(2009)。以組合派工法則求解雙流線型工廠排程〔碩士論文,國立交通大學〕。華藝線上圖書館。https://doi.org/10.6842/NCTU.2009.00211
洪毫寓(2010)。在CTO環境下考量潛在性訂單之多產品多廠區產能配置模式發展〔碩士論文,中原大學〕。華藝線上圖書館。https://doi.org/10.6840/cycu201000152
許秀如(2011)。訂單式生產導入供應商看板系統之應用與探討-以某汽車零件廠為例〔碩士論文,元智大學〕。華藝線上圖書館。https://doi.org/10.6838/YZU.2011.00033
陳建銘(2003)。多廠區緊急訂單承接評估及跨廠產能規劃探討〔碩士論文,元智大學〕。華藝線上圖書館。https://www.airitilibrary.com/Article/Detail?DocID=U0009-0112200611304408

延伸閱讀