以BIM模型為基礎之專案排程項次分析

Analyzing scheduling activities based on BIM models

指導教授 : 楊智斌
若您是本文的作者,可授權文章由華藝線上圖書館中協助推廣。

摘要


近年來建築資訊模型(BIM)在營建產業中日漸受到重視,而除了傳統3D模型交付外,以3D模型搭配完整時程交付並不普遍。國內應用BIM技術時,4D應用之現況通常僅以3D模型及簡易時程項次連結產生,但對於時程項次與內容之要求並無任何規則及說明。本研究主要目的為,透過國內目前在BIM模型建立上普遍採用的LOD發展程度為基礎,分析當專案需進行4D模擬時,時程應有之工作項目、項目分類、項目連結元件等內容,並利用一建築案例測試其合適性。研究結果顯示,若要以BIM模型為基礎進行完整的4D模擬,國內傳統的排程項次之安排需要進行大幅度的調整。

並列摘要


Recently Building Information Modeling (BIM) technology has been recognized as an essential tool for improving construction productivity in the construction industry. Excluding delivering pure 3D models, there is a few projects to delivery 3D models with complete project schedules. In Taiwan, to implement BIM for constructing 4D models, the practionner usually integrates 3D models with simple scheduling activities. Notably, there are no clear rules and specifications for scheduling activities for constructing 4D models. Based on general accepted Level of Development (LOD) concept, this study proposes an approach to analyze the necessary activities, activity types and linking models for constructing 4D models, and then examines the approach by developing 4D models for a house. This study concludes that it is necessary to modify existed schedule activities for constructing 4D models.

參考文獻


〔16〕李皇,(2012),建築資訊模型應用於橋梁受震分析設計之研究,國立成功大學土木工程學系碩士論文。
〔17〕郭瑞濬,(2012),建築資訊模型應用在高樓結構碰撞問題之研究,國立成功大學土木工程學系碩士論文。
〔19〕薛耀東,(2012),建築資訊模型在單間樓層剛架裝設液流阻尼器防震控制之應用,國立成功大學土木工程學系碩士論文。
〔15〕蔡宗瑋,(2012),性能導向之參數式設計於BIM整合評估流程,國立成功大學建築學系碩士論文。
〔24〕李偉毓,(2012),支援SOHO設計團隊之參數化設計管理平台,國立成功大學建築學系碩士論文。

被引用紀錄


林志錡(2015)。國內營造廠應用BIM現況調查〔碩士論文,淡江大學〕。華藝線上圖書館。https://doi.org/10.6846/TKU.2015.00599
楊雨蒨(2015)。結合竣工時程網圖與BIM技術以利爭議釐清之研究〔碩士論文,國立中央大學〕。華藝線上圖書館。https://www.airitilibrary.com/Article/Detail?DocID=U0031-0412201512092538

延伸閱讀