公路工程進度延誤之風險分析

Analysis of Risk of Delay of Highway Construction

摘要


由於公路工程施工中所存在的不確定性與影響因子眾多而不易掌握,故易造成工程進度延誤的發生。爲有效地衡量造成公路進度延誤之因子與風險,本研究首先提出模糊層級分析法(Fuzzy Analytical Hierarchy Process, FAHP)用以衡量各項因素對造成公路進度延誤發生之影響程度,再將之與失誤樹分析法(Fault Tree Analysis, FTA)相結合,用以分析公路工程進度發生延誤之因果關係及其風險值。最後,以公路總局九十年度進度延誤標案爲例進行分析,其結果說明本模式之有效性與實用性,可作爲協助公路進度管控與工期延誤風險評量的良好工具。

並列摘要


Due to numerous uncertainty factors contained within highway construction projects that can not be handled well, the schedule is often delayed. In order to effectively assess these factors and their associated risks, this paper presents a Fuzzy Analytical Hierarchy Process (FAHP) to quantify the degree of influence on project delay. Combining this proposed model and Fault Tree Analysis (FTA), the cause-and-effect relation and the risk of construction delay can be analyzed. Finally, a case study based on highway projects that were postponed in 2001 is presented to demonstrate the effectiveness and practicality of this model. The results indicate that this model can be used as a powerful tool for the scheduler to control project schedules and evaluate risks of delay in highway construction.

被引用紀錄


紀士釗(2008)。全球整合型企業營運關鍵成功因素之研究〔碩士論文,國立臺北科技大學〕。華藝線上圖書館。https://doi.org/10.6841/NTUT.2008.00069
王韋智(2012)。計劃性維修線路端點之斷電風險評估〔碩士論文,國立屏東科技大學〕。華藝線上圖書館。https://doi.org/10.6346/NPUST.2012.00103
謝永昌(2010)。捷運工程施工階段業主風險管理之探討〔碩士論文,國立臺灣大學〕。華藝線上圖書館。https://doi.org/10.6342/NTU.2010.01597
謝聯球(2009)。公共工程建設履約期間廠商財務困窘後續影響之研究 -以「國道一員林至高雄段拓寬工程施工階段」為例〔碩士論文,國立臺灣大學〕。華藝線上圖書館。https://doi.org/10.6342/NTU.2009.03089
吳若萍(2008)。公共營建工程契約中遲延完工之問題研究--以不可歸責於承攬人為中心〔碩士論文,國立臺灣大學〕。華藝線上圖書館。https://doi.org/10.6342/NTU.2008.02164

延伸閱讀