透過您的圖書館登入
IP:13.59.82.167
  • 期刊
  • OpenAccess

應用計畫評核術評估民航發動機修護工廠組裝時問-以A公司為例

Using Program Evaluation and Review Technique (PERT) for Evaluating the Assembly Span of Civil Aircraft Engine Maintenance Plant: A Case Study

摘要


民航發動機維修範圍變異大,組裝作業時間不確定性高,需使用特定的維修資源,並在特定時間內與飛航安全的要求下,將發動機維修完成交付航空公司,其作業流程的規劃與控管具有專案管理特性。因此,本研究利用計畫評核術(PERT),辨認發動機組裝的要徑作業,評估發動機組裝時間,並結合作業基礎成本制(ABC)所提供的作業費率計算發動機組裝成本。本研究也探討不同維修範圍下對發動機組裝時間之影響,並分析趕工需求下,修護工廠採行「非原件回裝」、「增加限制資源」、「要徑作業趕工加班」三種因應策略對縮短發動機組裝時間之影響,期能作為評估發動機修護工廠組裝時程之依據。

並列摘要


There are several characteristics of civil aircraft engine MRO business. These include considerable variations in work scope, high uncertainty of activity time, requiring specific equipments and technologists, having time limit to complete, and conformity to the aviation safety regulation. Consequently, the planning and controlling processes of the assembly activities are similar to the spirit of project management. This study uses Program Evaluation and Review Technique (PERT) for identifying the critical path activities and estimating the span of engine assembly. Besides, this study applies the fares of work centers analyzed by Activity-Based Costing (ABC) to calculating the assembly costs. And the effects of different work scope on the critical path are also discussed. Finally, in order to shorten the assembly span, this study proposes three crashing strategy: (1) assembling the engine by spare modules; (2) purchasing more critical equipments; and (3) crashing on critical activities. We hope that this study can help engine maintenance plants to evaluate their assembly span and probability.

參考文獻


Alpert, M.,Raiffa, H.(1977).Systematic Search in High-Dimensional Sets.SIAM Journal on Numerical Analysis.14,296-312.
Gido, J.,Clements J. P.(1999).Successful Project Management.Thomson Learning Inc..
Hillier, F. S.,Lieberman, G. J.(1999).(Introduction to Operations Research).
Kaplan R. S.,Cooper R.(1997).Using Integrated Cost Systems to Drive Profitability and Performance.(Cost and Effect).
Kerzner, H.(1995).A Systems Approach to Planning, Scheduling, and Controlling.(Project Management).

被引用紀錄


蔡昕翰(2012)。毫微型蜂巢式基地台新產品開發與營運模式分析〔博士論文,國立交通大學〕。華藝線上圖書館。https://doi.org/10.6842/NCTU.2012.00568
吳佩蓁(2009)。臨床路徑流程改善決策支援系統之開發-PERT/CPM之應用〔碩士論文,長榮大學〕。華藝線上圖書館。https://www.airitilibrary.com/Article/Detail?DocID=U0015-2807200910234000

延伸閱讀