Since 1988, the bored holes of cast-in-place piles in Taiwan are mainly stabilized by tempor.ary casing instead of the traditional slurry method. The idea of construction, equipment, application, problems and the ways to solve them, specification and quality control, and the prospects of the construction method were discussed in this paper. It is eagerly anticipated that the method be known more by the engineer and it's application can be extended more.